Skip to content
View in the app

A better way to browse. Learn more.

Dry Dock Modeler

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.
Welcome to Dry Dock Modeler

HM Cheerful 1806 by glbarlow - Syren Ship Model Company - 1:48

Featured Replies

  • Author

Post 36

The deck build out

Happy New Year! (remember it's a repost and I'm not editing, still, Happy 2026)

With the holidays and family work is going slow on Cheerful. I’m off book from Chuck’s monograph, choosing to do some small projects that I could do independently as I found workshop time. I don’t plan to start gluing stuff to the deck until I have most of it built and ensure everything fits together. So nothing shown below is mounted, just temporarily sitting in their future homes.

post 36-3491.jpg

OK, one note: I would have done the hatch different today, and did on all subsequent models so the grating matched the curve of the cowling. At the time I liked the look, still do a little.

Having first built the stove and mounted it below decks I then added the galley stove pipe (ok, so I didn’t build a stove:-D. The stove pipe is straightforward, I didn’t take any construction photos. I took the dimensions from the plan and cut the four sides from 1/64 yellow cedar sheet then painted with Admiralty Ironwork Black paint. Though not on the plans I also added a .025 piece to the bottom to simulate the lead sheet coating that would have sealed the pipe between the deck and the stove below. I rounded the edges quite a bit and also applied Doc O’Brien Rusty Brown weathering powder to the outside and Smoky Black powder to the inside to simulate it being metal. I had acquired some thin lead sheeting for this stove pipe but it just looked clunky, so out it went. The weathering powder looks great in combination with the Ironwork paint.

post 36-3469.jpg

Next up was the extension of the stern post into the deck. I like how Chuck accounts historical accuracy but remembers it’s a model and not the real thing. This small post starts as an overly large laser cut piece from the starter kit that I then shaped to fit. Though small, it took quite a bit of time to shape and fit properly, there are more angles than you’d think. The photo shows the starting point (from the included extras) and the final result which now looks like the stern post was cut through the deck as a single piece - no way to know the difference. A small thing but kinda cool.

post 36-3537.jpg

Part of getting the stern post to fit is matching it up with the rudder. It requires some shaping to taper it from top to bottom on the trailing edge and a different taper on the leading edge. The plans are very clear so I used my various sanding tools to get what I liked painted red the portion that goes through the deck and applied multiple coats of WOP to the rest (probably a few more coats yet to go). All my future model’s rudders will be shaped like this, its’ a nice and proper look I think.

post 36-3509.jpg

Since I was working on the stern I also cut and shaped the tiller from some scrap boxwood I had. I was mindful of the shape necessary to peg into the rudder and curve to about 21mm from the deck at its end, mini-me verified the height and length were ok. Again nothing is glued, the tiller is just sitting temporarily pegged into the rudder. It will be a bit better aligned once glued. I don’t know that my method to build the tiller is one I’d repeat - I used the lathe (really I wanted an excuse to use it) to shape a square straight piece then my plank-bending station to create the curve. I cut some subtle grooves in the “handle” wouldn’t want a hand to slip off the tiller during a storm.

I put dry heat wood bending to the test with the thickness of this tiller, it took multiple times to slowly get wood to bend to the curve. It may have been smarter to rough cut it the curved piece with a saw and shape it from there. But hey, I got to use my new lathe so… It’s possible I may make this again, I’m not completely sure I like it.

post 36-3500.jpg

The mast cap was next, and the chance to use my mill (Cheerful has been my excuse for a workshop upgrade or two). I have left the interior intentionally a bit small, I’ll sand it out to fit the mast once I make that much later from now. Here’s the final version (maybe) with WOP added.

post 36-3495.jpg

The technique comes from Derek who was kind enough to explain to me how to go about making it. I’ve made about seven or eight “practice caps,” improving a little with each one. One thing I learned is how fine the measurement on the mill X,Y, and Z axis handles are, it’s easy to set measurements at .1mm once you get the hang of it and not so easy if you haven’t.

post 36-3494.jpg

I started with a square boxwood blank glued to a wood dowel then tightened the dowel into the Proton dividing attachment with the mill bit above and centered. I moved it out 10mm then cut the outside and back in 4.5mm to cut out the center. It’s key to have the piece fully glued to the dowel (I learned). Not show,  I used my recently acquired Proxxon router bits to shap the outer edge and then a small bit to cut the top ring.

To be clear the attempts in the mill photos are not the one shown as the final product. I had to keep learning how to apply the various bits and managing the 3 axis of the mill to finally get one I liked.  It’s pretty incredible what the mill with the dividing attachment and various bits can accomplish. As Chuck points out a real cutter would probably just have tarred wrap at the base of the mast but where is the fun in that.

post 36-3489.jpg

post 36-3492.jpg

Back to the mill for the ladders combining techniques learned from Derek and Rusty. I cut the 5 rungs in a single sheet of yellow cedar, used the plans to determine the angle, cut the struts, shaped and sanded it all and added the steps.

post 36-3499.jpg

Paint it red and I have my bulwark ladders. Making one wasn’t as difficult as making two exactly alike. I will add that Bartley also has a nice technique for ladders on his Cheerful that’s a variation on this approach.

post 36-3507.jpg

And then it was the Bowsprit Step using one of @Chuck’s fabulous mini-kits. The design of these kits are amazing. In this case the uprights are composed of three layers, by doing so the notch for the pawls is created when the three are glued together. I then shaped the tops with needle files and sanding sticks. I thought about the mill, but elected to do it by hand, I will be trying to cut other uprights with it though.

post 36-3523.jpg

I simulated the bolts by cutting the stem off an eyelet and gluing it over the wire that passes through the post holding the pawls (fun fishing that wire through) then snipping the wire flush with the eyelet. and painting it Ironwood black The pawls, like all metal simulating wood, were painted Ironwood black and dusted with Rusty Brown weathering powder. The pass through strips are long and loose, they will be cut to fit once assembled with the bowsprit.

post 36-3534.jpg

I had built the windlass from Chuck’s mini-kit a long while ago, it was finally time to match it up with the bowsprit step, at least temporarily, on the deck. I won’t glue any of this until I have the bowsprit made, all three have to be in alignment and fit together - so its off to my storage shelf for both items.

I’m off to start on other deck projects, I’m thinking the wench next, but we’ll see.  There are bowl games to watch today.

Regards,

Glenn

In progress: HMS Surprise

Completed: HMS Winchelsea , HM Cheerful (repost), HM Flirt, HM Harpy, Medway Longboat, HMS Pegasus, HM Granada, AVS, Royal Barge, HMS Vanguard, HM Pickle, Fair American, Lady Nelson, Bluenose

  • Author

Post 37

Deck furniture continued

This was fun. I’ve scratch built a few things here and there in my modeling but Cheerful’s winch is the first ‘complex’ thing I’ve made from nothing but some wood and a set of plans. As I’m prone to do I thought I’d share how I made it - once again acknowledging there are many ways to do things, this is just mine…and it was my first.

post 37-3551.jpg

The mini-kits available for Cheerful are great little projects in and of themselves, however in the case of the winch Chuck elected to leave us to fend for ourselves. So I gathered up the material I’d need, two thicknesses of wood strip, one of wood sheet and two basswood dowels I had in stock along with some brass rod and brass micro-tubing and off I went.

post 37-3541.jpg

First I cut square pillars from 7/32 stock and the crossbar from 3/16, thanks Byrnes saw. I cut out the pillar supports from a copy of the plans, rubber cemented them to 1/8 sheet wood, then cut them out using my scroll saw - cutting right along the line and through the paper and keeping my fingers.

post 37-3542.jpg

Then it was to the mill. I learn a little more each day about how valuable and useful the Proxxon MF 70 can be. I’m still fumbling a bit maintaining consistency with the X,Y.Z axis control. While they can be very precise the knobs can be a bit tight.  Stating the obvious, t’s important and a bit of a challenge to get zero set. I used a piece of paper between the bit and the wood - when I could barely pull the paper between them, literally scratching the paper and not the wood, I set the knob for that axis at zero.

post 37-3545.jpg

I used the mill to cut the notches in the cross bar and a more shallow notch in the two pillars, so that the cross bar sits out from the pillars when connected. I also used the mill as a drill press, drilling a hole through both pillars together for mounting the winch drum. Again the obvious, it’s critical for the milled parts to be level top and back. The Proxxon vice accessory makes this easier, I cut various spacers from scrap MDF to help with the alignment.

post 37-3547.jpg

I now had the easy part done. The winch drum, a small thing, was more problematic. It consists of the drum, raised spacers, and sprockets. I thought about using the lathe, I mean I have it and all, but the crown, the raised portion of the drum (like a spool of thread) had to be equal to the sprockets which I had no clue how to make. So I used a larger basswood dowel, sliced off two pieces, then used my chisel to cut notches around the dowel, painted it Ironwood Black, dusted it with Rusty Brown weathering powder, and sliced off two sprockets. I glued all 5 together for a completed drum.

post 37-3550.jpg

With this done I had all the major components. Time for a little dry-fit test. Following the plans proved important, as it always does, since the overall width of the winch supports have to fit between the deck ring bolts and stove pipe hatch.

post 37-3555.jpg

Then it’s back to the mill to shape the pillars. I went through a lot of practice attempts, and despite great advice from others I just wasn’t happy with my attempts to cut the angled top consistently on eight sides (two pillars). I know how now, I  just need more practice - it’s a surprising small angle as it turns out. So I opted for an alternate approach, I cut in the top 1mm from the top and 1mm in with a 1 mm bit, yes you can be that precise, creating the cap. I moved in 5 mm and cut a .5mm slice to form the base of the cut in. That was it for the mill. I thought about going ‘fancy’ on the crossbar but it’s not shown that way on the plans so I just rounded off the edges by sanding.

post 37-3557.jpg

I used my freshly sharpened (I know how to do that now too) Veritas Chisel to slice in the angle using the .5mm cut as a stop and finished it up with needle files and sanding sticks. I was able to create the eight consistent sides this way, something a proper use of the mill could have done faster (well, maybe not by me), but I venture to say not better.

post 37-3562.jpg

After painting the assembly and adding in the drum using brass rod inserted into both sides the last step was the handles.  There are of course numerous ways to go about this. I chose to create the handles using small boxwood strip shaped and sanded, drilled holes into both ends, make the handles from brass rod with small micro tubing glued over it, the other end added to the brass rod on the drum then the rods cut flush. Of course it being ‘metal’ I first painted them Ironwood Black and added the weathering powder, it makes a difference even on these small handles.

post 37-3564.jpg

post 37-3565.jpg

And I now have a completely scratch made winch, it goes on the shelf with other deck items until later. I’m kinda proud of it, obviously since I devoted a post just to it. I offer this to those considering building Cheerful: It has presented me with the opportunity to try so many new things I’d not done before despite having built nine kits. I’m treading new ground with each step.

At first I was kinda wishing for another mini-kit for the winch but now am quite happy with the opportunity to build it on by own. I also once again thank others for their help and inspiration and can only hope I can provide a little inspiration myself for others take on this great model.

Regards,

Glenn

In progress: HMS Surprise

Completed: HMS Winchelsea , HM Cheerful (repost), HM Flirt, HM Harpy, Medway Longboat, HMS Pegasus, HM Granada, AVS, Royal Barge, HMS Vanguard, HM Pickle, Fair American, Lady Nelson, Bluenose

  • Author

Post 38

I’m continuing to do mini-projects in no particular order - following the ‘why don’t I do that next’ plan. So:

Mounting the rudder

post 38-3567.jpg

When I first looked at the Pintles and Gudgeons mini-kit I wondered what do you do with those. Turns out it’s another brilliant design and a simple way for attaching the rudder.  Simple in concept anyway.

post 38-3569.jpg

The first step was to paint the gudgeons Ironwood Black then dust them and the straps with weathering powder, because you know you can never do enough weather powdering. Attaching to the rudder itself was straight forward, I left the pintles long initially then trimmed it back after some test fitting.

post 38-3570.jpg

Then came the more challenging part, attaching the gudgeons to the hull in the right place to fit the rudder and in line. After some careful measuring and marking I used a piece of brass wire to make sure they were aligned. There isn’t any forgiveness here, everything has to be in the right place.

I encountered a problem, I couldn’t get the glue to adhere to the hull, after several frustrating attempts I determined that glue sticking to wood with too many coats of WOP doesn’t work - I simply had let it get it too thick on the stern post. I roughed up the wood with some 220 grit, and after that no problem. I of course knew this, but sometimes in the thick of it you just want the wood to shut up and do what you tell it to do - the wood laughs. I also shouldn’t do these things at night, or maybe not at night after drinking scotch, or maybe just not after drinking scotch.

post 38-3575.jpg

Anyway. The straps and bolts are added. I liked how drilling holes as marked on the strap, inserting wire a little long to glue it in and then cutting it near flush made for nice bolts after touching with Ironwood Black (a little touch up there to do on the hull, oops).

post 38-3581.jpg

post 38-3579.jpg

And there you have it, my ship can now be steered should it find itself adrift in the ocean somewhere. I still think I’m going to remake the tiller, we’ll see, it’s just hanging there loose for the photo. So with that done the rudder is removed and put on the shelf to be permanently installed later, bye rudder.

The Catheads

post 38-3582.jpg

Then, since it can be steered I figured I better be able to anchor it so do the catheads next. That meant it was time to play with the mill again and pretend I know what I’m doing. Following the monograph I constructed them in two parts. First the upright, which in order to fit tight against the bulwark had to be notched for the spirketting and again for the waterway. I cut both notches with the mill. While it takes the unskilled like me a bit of work and trial effort to the the measurements right, the mill cuts nice and clean once I had it right (actually it cut nice and clean when I had it wrong too). I bought a car engine feeler gauge, took it apart and used the thinest one to set a good zero for the bit at the wood for the X,Y,Z axis. This proved pretty handy in getting a consistent starting point for the cuts.

post 38-3584.jpg

It was fortunate I read the monograph first (not that fortunate as I always do). Before starting on the catheads, the forward pin rail has to be made and installed. That has to be sized carefully so that the cathead doesn’t impede the flow of the anchor rope through the hawse hole or restrict the gun tackle for the forward chase port, there isn’t that much room between the two. I had to do a little fine tuning on the pin rail not related to the cathead as shown here.

post 38-3585.jpg

post 38-3586.jpg

Next up is getting the correct angle on the upper piece of the cathead, hint, it’s not 90 degrees. There needs to be some upward angle to it, while also accounting for the bit of lean of the upright on the bulwarks. After some experimenting I determined 85 degrees was best (or 95 degrees depending on how you look at it). Since the Byrnes gauges don’t do notch anything less than 15 I set it on the sander for a smooth angled edge using a digital protractor. Then to get a good feel for it set the top piece on for a look. I decided this made a great ships crane and installed it just like shown here. Not really, but it did occur to me for a second. When I know I’m going to need multiple equal sized pieces, plus several more for testing I cut a properly sized long length and cut everything from it.

post 38-3588.jpg

Then its back to the mill to cut the sheaves into thetop piece. This is so incredibly better than doing these by hand with a blade as I’ve always had to do in the past. Just cut the slots a 1mm deep and drill all the way through on both ends. I added flush-cut 24 gauge wire to either side later but they don’t go all the way through and are just for simulation.

post 38-3593.jpg

This little Veritas triangle, a new tool, has been coming in handy a lot for deck work, here to make sure the cathead is perpendicular to the deck.

post 38-3594.jpg

post 38-3595.jpg

Some filing at the leading edge, paint, a couple of cleats, and I have catheads. No anchors so the ship is still drifting, but at least they have something to attach one, or maybe Fred, their fellow crewman who drank all the grog and just let him hang there a while. BTW, they are straight, the photo is a warped perspective due to the angle. You can see why I was later adjusting the bow pin rail.

The Seats of Ease

I admit I struggled with the concept of this a bit. These seats are such a prominent feature of the deck. Then I have this vision of two crew members availing themselves of the seats, just a few feet from the helmsman. There is no cover on them (I almost added one) so I wonder, given the prevailing wind on a sailing ship is generally from either rear quarter, that the helmsman - often the captain on a ship this size - was constantly bombarded by the smell. So I almost turned them into lockers and let the crew poop over the rail. In the end I decided to stay true to Chuck’s design and accepted they’d be a conversation topic once the ship was finished. So I began to build my two onboard outhouses with apologies to the helmsman…courtesy flush dude (which would be a bucket of water I suppose).

post 38-3600.jpg

It seems simple, just glue together three pieces of wood, the top, one side, and the front. The thing is, again, there are a lot of angles involved - plus you are making two and the two have to be both identical, level and the height is even with the spirketting since that forms the outboard side, and be the width of the inboard stern frames. Here’s hoping I installed all of those equal on both sides so long ago. I started by cutting card templates (as Chuck suggests) - its kinda essential here to get the right fit. I’m sure there is a geometric name for the shape of the top, let’s just say it doesn’t remotely resemble rectangle. I also cut a long strip 9mm wide from 1\32 sheet so that the front and sides for both seats came from the same piece of wood.

post 38-3599.jpg

This photo is from later in the instruction. I first did the sides since everything else is based on them. The challenge is cutting the curve of the counter on the bottom, having both end up the same height and level, be the same length coming forward, and the leading edge perpendicular to the deck…no problem…who doesn’t love geometry.

post 38-3601.jpg

And what do you know on the first try both sides are level…or maybe not on the first try…

post 38-3603.jpg

After cutting the fronts - with the outboard side beveled to fit snug to the bulwarks, it was on to the top. There is no substitute for card templates here. I marked the measurements, tested it and remarked until I had the varied lengths on the four sides required for it to fit, the angle of the hypotenuse or something like that. I used the cross cutting table on my Byrnes saw to get precise cuts on two of the sides, there is likely some way to do it with the saw, but I opted to cut the remaining two sides with my heavy steel rule and #11 blade. Again it’s possible I didn’t get all this right on the first try, card stock or not.

post 38-3605.jpg

With the pieces cut and only the sides glued in I test fitted everything, and what do you know it’s all level and equal sized, how’d that happen.

post 38-3604.jpg

The last step before mounting and painting is the ease part of the seat, cutting the hole, which after all the work to get two fitted tops I didn’t want to screw up. So I went slow with a small pilot hole, then a bigger one, then a round needle file, then a larger file marked with a sharpie to finish at a 4mm hole, and finally an ultra fine sanding stick to smooth it out. The bench lights are reflected on the paint in this photo, you don’t see that when just looking at it.

post 38-3615.jpg

I added two large cleats and 4 smaller ones then painted it by brush with thin coats of my favorite RED (again some iPhone camera distortion on the angles). The cleats come from Syren, available in multiple sizes. I had to remove the laser char (it shows through the red paint) and shape them a bit. I used the stem of a standard eyelet to pin them so they can take some rope tension later. I also added the horse, created from 24 gauge wire. I used the eyelet portion, cutting off the stem flush to the circle, to accent the horse either side, painted it Ironwood Black and weathered it to finish off the stern - except the knees and boom crutches which are up next…maybe…

Pin rails and cleats

post 38-3612.jpg

I finished up this phase by adding the bulwark pin rails along with the rest of the cleats noted on the plans. Turned out to be a pretty tight fit for the cleat nearest the ladder. I’m glad I checked that, I had to give it a little extra turn to allow the ladder and gun tackle to fit with room for the future lines shown on the rigging plan. It’s generally a good idea to take a look around at what might happen or be added later to make sure nothing gets in the way of something else. That was evident here and especially evident with the catheads.

As I noted I’ve been turning pages in the monograph and doing what I felt like doing next - at this phase, at least so far nothing has to be sequential, though that will change soon. Thanks everyone for the likes and for stopping by. I better go check to make sure the crew didn’t actually drown Fred.

Regards,

Glenn

In progress: HMS Surprise

Completed: HMS Winchelsea , HM Cheerful (repost), HM Flirt, HM Harpy, Medway Longboat, HMS Pegasus, HM Granada, AVS, Royal Barge, HMS Vanguard, HM Pickle, Fair American, Lady Nelson, Bluenose

  • Author

Post 39

Small things take time and iteration to get right. That’s the lesson I have to remember at this stage of the build.

The Tiller V.2

I decided to re-make the tiller. As I did the last time I started with a square length of boxwood, a couple of inches longer than the tiller, and turned it on the lathe after following the 7-10-7 rule to remove the edges with my mini-planer. I wanted a different tiller handle and did most of that on the lathe with needle files and sanding sticks.

post 39-3619.jpg

Out came the bending station. Just as it is for planking, the heat of the iron made for a relatively easy bend, though it did require a couple of iterations to more slowly work the shape than with a standard plank. By using a metal clamp in the center I was able to tilt the iron onto it so the iron didn’t physically touch the round tiller - I used steam, it worked well and took very little time to get right.

post 39-3627.jpg

I got a better result the second time around, more of a bow instead of a bend, beefier, and a better handle so I’m glad I took the time. I checked it’s height with mini-me on the deck, it looks right to me now.  And then off it came and along with the rudder up on the shelf it went until I install them later. I have a lot of stuff on the shelf now, install day is going to be fun whenever that is.

The Knees

post 39-3621.jpg

These were not simple and serve as a reminder this is mostly a scratch build.  But I doubt even if they were laser cut it would have helped much. I started by duplicating the drawing from the plans with the scroll saw - it wasn’t even close and I tossed it aside. Back to card stock to determine the angles, always the angles. The first step is getting the stern and sides and to decide on the length for both. I settled on 25mm on the stern and 20mm on the bulwark for no other reason than it looked right. I used my Byrnes saw to cut the blanks.

post 39-3646.jpg

There were a few iterations as I discovered the various angles and notching I had to account for, it wasn’t initially obvious to my untrained eye. I quickly determined the yellow cedar was a bit soft for all the shaping, sanding and beveling required (my problem not the wood’s) so I turned to my precious and limited store of boxwood. Before cutting them to their ‘knee’ shape I worked to get the proper fit snug into the corners and just below the cap rail. More angles, the transom curve and the flat cap rail required beveling both top and bottom, and then there are the stern frames, the knees are a tight fit between the rail above and the frames below.

post 39-3637.jpg

It wasn’t pretty - I notched the bottom of the knees and had to remove a bit of the frames, seaworthiness is assured by the tight fit or so I decided. I scraped some paint off the transom just to ensure good surfaces for the glue. I chose Titebond for this, I needed a few minutes to get them seated and the proper angle along the bulwarks and I didn’t want to test the strength of just PVA. These knees are there to stay.

post 39-3640.jpg

The boxwood sands nicely into shape, I gently rounded the outer edges before I glued them in - I was momentarily tempted to leave them natural - it would make no sense but they look nice.

post 39-3651.jpg

I added the smaller cleats as shown on the plan. I’ve used three different sizes on the model so far, all from Chuck’s store. As before there is some sanding to remove the char and to shape them a bit. Like the other cleats these are pinned on using the stem of an eyelet. Having gotten past my natural look impulse, I painted it all my usual Red.

The knees were another of those things I had to stare at and think about to decide the process and order of things. It was a good move to get the fitting right before cutting them into their final ‘knee’ shaped, it gave me something to hold onto as I tweaked and tweaked and tweaked again to get the required tight fit, top, bottom. left and right. It took a good deal of time, several days, to get through the iterations for something seemingly so simple and maybe not that noticeable in context of the larger ship. I will say though it was rewarding when they were done. Something I can look at, know what went into it, and think to myself - I made those. I showed my wife, who took a look, looked at me, and said “those are nice…..” and walked out.

Timber heads

post 39-3649.jpg

I’ve come up with my own way for making pillars and by result, timber heads. I know there are better ways in using the mill for the total job, Derek has been kind enough to share those. My method is a hybrid. For the timber heads I’ve cut the “cap” by cutting in .8mm from the top and .4mm deep on all four sides then dropping down 4mm and cutting a .3mm  deep all using a 1mm cutter bit.  I’m then taking my freshly sharpened chisels to slice from the top down to the cut to shape the timber head, which of course isn’t square. At this point I’m just more comfortable, and considerably faster, cutting it partially by hand with the chisels. I really like the mill, I’m learning more how to use it - but it’s a process to set an accurate zero on two, sometimes all three axis and repeating that for each side after I flip it and again for each of the 5 additional timber heads (actually 6 additional, I choose the best six after cutting seven) so that all are completely identical. While it’s true I can make .4 and .8mm cuts, that only happens with an accurate, repeated zero starting point. The Proxxon mill is great, but I wish the zero turning dials were a little bit smoother maybe they wear in over time. Anyway.

post 39-3658.jpg

In addition to the chisels, I finish them up with files and sanding sticks. You might notice the paper below in the photo, I spend a little time, and that iteration thing again, getting to the sizes and cuts I think look right. There is no clear design and the size is a bit flexible. I once again got to exercise my -  if ‘it’s not right rip it off and do it again’ motto. After making all six timber heads I decided they were too wide and tall so I tossed them and started over. I guess I could have figured that out after making one - but I didn’t until I saw them sitting (not glued fortunately) on the cap rail. I drilled holes and pinned them all into place using those ubiquitous little nails from past models with the heads removed.

post 39-3659.jpg

The four on the bow were straightforward, once I got the size right, the two on the stern are a little tricky - they need to be perpendicular to the water line, while mounted on a cap rail that has a significant sloop at the stern. I leveled the boat in the Amati working stand then used another level (these little ones come in handy over and over) and some scrap wood to determine the angle, cut the scrap on that line as a template and transferred it to the timber head.. I had made all the timber heads intentionally long to give me grip when cutting and filing and plenty to work with to cut the angle. BTW, that’s light glare, not bad painting on the wales and fashion piece, along with a little dust which will all get cleaned up later. …close up photos reveal all …

post 39-3673.jpg

I have “The Cutter” I normally use to chop small pieces on exact angles, but in this case it would not get as flush a cut as I needed on the thicker wood.  I got this jeweler’s saw to cut the stern frames way back when, it’s coming in handy again now. In addition to this cut on the stern timber head I used it to cut the knee part of the knees (much too small for the scroll saw, at least for me) after I had fitted the pieces as described above. It makes short work of cutting wood to thick for my #11 blade and is accurate in staying on the cut line.

post 39-3676.jpg

post 39-3677.jpg

Here they are all glued on and painted with Admiralty Dull Black, its all good and on to the next thing. I’m betting this is more than you ever wanted to know about timber heads. Everything is more interesting to me when I made it from scratch I guess.

Speaking of which, time to move to the next fun item, the boom crutches - and guess what - there are a lot of angles involved. Thanks for stopping by, the likes and especially the comments are always appreciated.

Regards,

Glenn

In progress: HMS Surprise

Completed: HMS Winchelsea , HM Cheerful (repost), HM Flirt, HM Harpy, Medway Longboat, HMS Pegasus, HM Granada, AVS, Royal Barge, HMS Vanguard, HM Pickle, Fair American, Lady Nelson, Bluenose

  • Author

Post 40

The Boom Crutches

post 40-3685.jpg

I had to sort through how to get started on the boom crutches, the monograph picks up with how to approach the angles, which is essential to the process, but has the basic crutch already made, I had to figure out how to get to that point. I started with some rectangular blacks of ¼ sheet the a little larger than the ultimate width and height then with my pencil and paper constructed a series of measurements and lines to work from to create the initial Y. I suppose some can free-hand such things, I cannot. I wanted a precise beginning to get me to a precise end.

post 40-0278.jpg

I used a router bit on the mill for the half circle and the jewelers saw with the blanks in my small vise to cut out a starting point. As Chuck points out these need to be extra thick, the ¼ barely covers it. The reason is distinct angles that have to be accounted for and the resulting sanding and cutting to get those. The monograph starts with the side, I found it easier after a couple of false starts to start with the back angle first, then the side then the front. The two remaining angles, the top and the turn in towards the mast are best done after mounting.

post 40-3693.jpg

I had to get it to an appreciable size that seemed in scale. The crutches are not on the plans so I was eyeballing it based on the monograph photos and really what looked right to me. I went through several of my blanks, in fact I got one (show in the photo) very close to a final product only to decide it was two wide, so out it went.


Once I sorted out a process and the scale and got one about 50% near what I wanted I stopped and made the second one. One of the many challenges of these things is making the second one identical to the first. My approach, rather than finish one at a time was to bring two along together. There is a lot, a lot, of sanding to get from the Y blank to the shape and size I wanted and get the angles needed. I kept the two in balance by frequent measurements at key point with digital calipers, on a series of small papers (only the final one is shown) kept next to the sanding tools. I used of different grits, blocks, sticks and holders and a needle file or two here and there. It took two days of taking my time, slowly reducing the blanks into identical crutches resulting in what the photo shows finally attached to the stern.

post 40-3695.jpg

I recommend this approach. Rather than make one and copy it, make two together, reducing and shaping slowly just tenths of millimeters at a time. As I noted, I had several false starts on the first one - but once I had the basic Y blank right I had no throw aways on the second. I pinned and glued them on then made the final adjustments, filing the tops parallel to the water line and the turn inward on the angle the boom would rest from the main mast, then smooth and rounded the edges and it was ready to paint.

Stern Complete

post 40-3700.jpg

I’ve reached something of a milestone. The stern of my Cheerful is complete. I’m pretty happy with how its turned out so far. One challenge after another has been met, I’ve learned more new things than I can count and used tools I didn’t know I needed (ok, wanted). I have more  challenges ahead, like how to shape and file brass strip for the stays which is up next. So I’m off to do that, but I can look back (see what I did there) and see a portion of the hull now finished.


Thanks for stopping by.

Regards,

Glenn

In progress: HMS Surprise

Completed: HMS Winchelsea , HM Cheerful (repost), HM Flirt, HM Harpy, Medway Longboat, HMS Pegasus, HM Granada, AVS, Royal Barge, HMS Vanguard, HM Pickle, Fair American, Lady Nelson, Bluenose

  • Author

Post 41

Channels, Chainplates, Dead Eyes, and Strops

This is that moment when you know you’re not in kit world anymore. No PE to cut out and assemble and or laser ready wood to shape and paint, for this segment of the build every thing is going to be made from scratch. By now I sound like a broken record, but here again was something I’d never done. While Chuck’s monograph was as clear and helpful as always, I still had to figure out a way make each of these components. I had never worked anything from metal, I know - what limited skills I have.

post 41-42-0281.jpg

First up is the channels, take a stick of wood, make it pretty and capable of holding deadeyes and chainplates, then make four of them. The best purchase I’ve made for my modeling is my Byrnes saw, nothing beats it. Quickly moving into second place is my Proxxon MF 70 Micro Mill. I’m learning more and more how to use it, still very basic stuff, but things I’m not really sure how I would have made without it.

post 41-42-3707.jpg

post 41-42-3712.jpg

I chose to make these from my stash of boxwood. I like the yellow cedar but boxwood is easier to shape for more intricate pieces and is a harder wood to hold that shape. The boxwood and yellow cedar are complimentary on the model, adding just a little tone difference. Chuck’s mini-kits come in both woods, I chose the boxwood for all of mine, even the ones I painted.

post 41-42-3709.jpg

Next up is making the 6mm deadeyes. I made a simple jig to line up the three pieces, a small center and two outer pieces, basically a vanilla Oreo cookie complete with holes glued together after removing the char.

post 41-42-3713.jpg

I wanted to give the deadeyes a little character, a bit too neat in their form right off the sheet, so I tumbled them in this MicroMart block tumbler. It has a 220 grit sandpaper bottom, sides, and a 4 part spindle also covered with 220 grit. I connected the spindle to my drill, tossed the blocks inside and spun it until I liked what came out. Two things if you haven’t used one of these; I was more successful with it sideways as shown and I needed to reverse the drill (as in screw out not in) to match the the sandpaper. I’m left-handed so maybe I assembled it backwards, I do that on occasion. It’s a right-hander’s world.

post 41-42-3714.jpg

Then is was time for me to become a blacksmith and work in metal. I approached this step with a bit of trepidation. The monograph was clear enough on what to do, I just wasn’t sure how I was going to make 6 (near) identical backstays and 8 (near) identical chainplates from a strip of brass. For starters, it hadn’t been easy to find the right thickness and width of brass, but fortunately I’d completed this hunt a few months ago, now I have enough to make 176 chainplates, just in case. My first step, seemingly as always, was to find out how many different tools I could use - this is just a sample. I always hand drill everything made of wood with pin vises. However, this cheap battery powered drill was essential to drill the holes in the brass, I’d have been twisting forever otherwise.

post 41-42-3716.jpg

To make both the backstays and chainplates requires a bit of shaping and filing. I kept the shape simple so I could repeat it multiple times, jewelry making is not in my future. I of course could have filed these by hand, but hey, there is a mill sitting right there. It was slow going, for me, to set zeros on two of three axis for each side, so 22 times (I did the backstays working from the center as shown in the previous photograph). Of course it was more than 22 times, I had more fails during this stage of the build than any other by far. It took me more than a while to get a handle on working with the metal.

post 41-42-3715.jpg

Having finally completed the chainplates it was time to determine the proper angles using a temporary mask and string, a process most of us know and applies to any model (well not modern war ships I suppose).

post 41-42-3723.jpg

With the holes marked and drilled then it’s a dry fit to confirm everything is lined up. I only needed about a third of the length to attach the strops, but I didn’t know that when I was making these.

post 41-42-3731.jpg

And then off to the blackening station. I chose to blacken rather than paint these. The result is a more worn, gun metal look.  I was originally going to paint them Iron Work Black like other parts of the model but then decided I liked these. I think it provides a little character, more of a ‘I didn’t buy these from the store’ look.

post 41-42-3797.jpg

I normally like to explain how I did something in the hopes it will help others in some way, or at least provide a way they don’t want to do it. I had someone ask me recently in a PM to explain how I did seizings, so I went into great detail and even linked a YouTube video. The person replied, oh I don’t want to do it like that. Sigh...

Anyway, my advice for making deadeye strops is go find another build log. I had to learn every step of the way here. I’ve never soldered anything for a model, never used solder paste (though it's kinda cool, you apply it, hit with a torch and it flashes into a finished connection). Now I’m going to use it for some ring bolts just for fun. I had many, many fails. First make a circle and solder the opening (ok, got it, at least after I learned how to use the solder) then shape that around the deadeye in the traditional shape, Pop, there went the solder joint, start over. After many attempts I got 8 to shaped around the deadeyes and mounted on the chainplates. So yes, I made it all myself from brass strip and black wire - but I’m not the one to ask on best practices, even though it all turned out ok and I held to my standard of doing it over until I got it right. (Note: in this case that took a tremendous amount of determination)

post 41-42-3811.jpg

I’m done and ready to move on. This stage took me a full month. Of course it was partially due to Snowageddon here in Texas, rolling power outages, the lowest temperatures since 1949, real snow to play in with the grandkids. I was playing outside with them on a Friday after it finally warmed up to 24 (F) degrees (from below zero earlier in the week). On the Monday three days later it reached 76 (F) degrees…Texas…

I admit was frustrated a bit during this phase, so many fails. I thought more than once to use some retail ready fittings in lieu of my own but none would really work without cheapening the model, and I would have regretted it later. I am glad I did it all myself, I would encourage anyone who gets this point to do the same. The next time a model calls for metal work I now have some experience and I bet I could do it in half the number of fails.


Post 42

Note: Not sure why this was posted originally without comment, probably exasperated after chain plates, but it is post 42 so:

post 41-42-3145.jpg

Regards,

Glenn

In progress: HMS Surprise

Completed: HMS Winchelsea , HM Cheerful (repost), HM Flirt, HM Harpy, Medway Longboat, HMS Pegasus, HM Granada, AVS, Royal Barge, HMS Vanguard, HM Pickle, Fair American, Lady Nelson, Bluenose

Really enjoying following along as you repost, Glenn.

I'm getting a lot of ideas from this and the other build logs for Cheerful. Especially the work being done on the mill.

Steve

Current Projects: HMS Winchelsea 1764 1:48 scale

Completed Projects: Neptune Capstan 1:24 scale

Future Projects: HMS Portland 1770, Cheerful 1806, Medway Longboat

31 minutes ago, glbarlow said:

Post 39

Small things take time and iteration to get right. That’s the lesson I have to remember at this stage of the build.

The Tiller V.2

I decided to re-make the tiller. As I did the last time I started with a square length of boxwood, a couple of inches longer than the tiller, and turned it on the lathe after following the 7-10-7 rule to remove the edges with my mini-planer. I wanted a different tiller handle and did most of that on the lathe with needle files and sanding sticks.

I decided to time myself when I made the tiller on my Cheeful. 9 hours over several days. Ship modeling is definitely not for those in a hurry! Haha.

Erik

  • Author

Post 43

The last two items for me to make in completing the hull are the elm tree pumps and the fixed block, the first from Chuck’s mini-kit the second a scratch build.

Elm Tree Pumps

Post 43-3835.jpg

The first step is applying the 7-10-7 rule to a square piece of boxwood then using that to create the octagon shape of the pumps. The jig I used won’t win any ‘pretty’ awards, I modified it to work from a different jig, but is was effective in holding the small wood piece steady while I shaped it using my favorite finger planer. Between the planer, a file, and a sanding block I was fairly quickly able to get both pumps converted to octagons.

Post 43-3837.jpg

I painted the handle and bracket before removing these laser cut pieces from their wooden frame knowing I’d have to paint them again, it made doing that easier. The bracket has to be slice cut at its top to accept the handle, so back to my favorite mill again. This could be done by hand with a file I’m sure, but again, there’s a mill just sitting there. Though a simple cut it is very delicate and requires careful measuring - as you can see there is not much room to be wrong. The resulting hinge opening is very delicate, I was fortunate not to break one but if I had Chuck does include 3 of both the handle and the bracket in the mini-kit.

Post 43-3839.jpg

I drilled two holes at the proper deck location and inserted brass pins in the base of both pumps. It made it easier to add the spout and easier to paint holding them with my hemostats (more dental tools) as well as to install the metal (black paper) band around the top. Chuck provides enough strip if you want to add another band at the bottom. I like the way these look without that. Either ways is historically accurate for those counting.

Post 43-3840.jpg

And with that the last of the deck furniture is complete. Off they go to my construction shelf to be mounted later. The handles move so I can position them. I’ll have to watch closely to make sure they aren’t snagged during the rigging. And though they move I did not test to see if they remove any water from the bilge.

Fixed Block

Next up is the fixed block on the starboard side of the stem. For this I had only the plans to go by and consulting of other logs for ideas, once again the strength of MSW. This turned out to be a pleasant afternoon’s project start to finish. It was fun to figure out and make.

post 43-3843.jpg

I started with a piece of scrap boxwood - I just love boxwood, it’s so nice to work with, shape and polish into shape. I’m glad when I have a use for it not calling for paint, it is also very complimentary to the bulk of the model’s yellow cedar. I cut a piece longer than I needed 6mm wide (per the plans) and 3mm thick (just looked right, no way to tell from the 2 dimensional plans). I suppose I could have made it from a piece 2mm thick but with its required U shape I was concerned it might break at the joints. Of course this is a task the mill is perfectly designed for, much crisper and faster than I could have done it by hand.  Have I mentioned how much I enjoy having the mill…

post 43-3844.jpg

I failed to take a photo of the reverse side of the block - essentially it’s cut to a block form U. The plans call for the ‘indention’ to be 6mm long and deep enough to hold the sheave, and as it happens a perfect fit for the 5mm pear wood deadeye I took from my Speedy kit. I drilled a hole in the center of both the block and deadeye, I did have to sand the sides of the deadeye considerably for it to fit between the block and the stem, which is ok, it looks like a sheave now. I drilled a hole for a 22 gauge wire center for the sheave and four 24 gauge wire mounting holes.

post 43-3845.jpg

The extra length was handy for testing holes and for holding the piece both in the mill vise and on the work bench. Once everything was ready I carefully sliced it off with the cross cut sliding table on my Byrnes saw. You can see the paper it’s sitting on are the measurements (1mm turns of the axis wheels) and notations used for cutting it on the mill, I have to do this otherwise I lose track.

post 43-3848.jpg

I spent a considerable amount of time with fine and extra fine sanding sticks to round it off and shaping it to look a little worn and pounded by the waves, then attached it with CA and firmed it up with the wire mounts. I had mounted the center wire and deadeye first. The uncut center wire from doing that was handy in giving me something to hold on to while lining it up on the stem.

post 43-3853.jpg

With the wires cut to stand proud and their tops painted Iron Work Black the block is done.  So is all of the deck furniture, though most not yet mounted, making this something of a milestone. Next up is making the bowsprit. I need it to determine the location of other pieces. Once I have that done I’ll next rig the cannons while there’s room then mount the remaining deck furniture, bow sprit, and mast. I’ll pause to enjoy the work, then it’s time to rig.

One decision I haven’t made is whether to include anchor hawse running across the deck. I like the look but not sure I want to cut holes in the forward hatch, I’ll have to decide soon though.

Thanks for all the likes and comments, I appreciate and enjoy your taking the time.

Regards,

Glenn

In progress: HMS Surprise

Completed: HMS Winchelsea , HM Cheerful (repost), HM Flirt, HM Harpy, Medway Longboat, HMS Pegasus, HM Granada, AVS, Royal Barge, HMS Vanguard, HM Pickle, Fair American, Lady Nelson, Bluenose

  • Author

Post 44-59 still to follow - thanks for looking and giving me motivation to keep matching Apple Notes to LR photos, fun stuff.

Regards,

Glenn

In progress: HMS Surprise

Completed: HMS Winchelsea , HM Cheerful (repost), HM Flirt, HM Harpy, Medway Longboat, HMS Pegasus, HM Granada, AVS, Royal Barge, HMS Vanguard, HM Pickle, Fair American, Lady Nelson, Bluenose

  • Author

Post 44

Bowsprit and Mast

With all the hull and deck furnishings made its time to mount them to the deck…except it isn’t. I decided I needed to make the bowsprit to ensure I put the bowsprit step in the right place and I shaped the main mast to ensure the mast coat and mast slot were correct, and because I was on a roll turning square things round (see what I did there…roll….I crack myself up).

Post 44-2.jpg

Due to my having to restart after my dropped hull (still makes me shudder almost a year later) I have two sets of plans.  This has come in handy, allowing me to do cut outs of various sections while keeping one set whole. In this case I cut the bowsprit and mast so I have them right by the work piece. I marked the square piece of cedar using the 7-10-7 rule and used the mill as a drill press to drill the three holes at the base - I later used a file to square the two forward holes that would be visible once mounted. I also drilled the hole for the sheave at the forward end, much easier to to that while its squared - and as advised by Chuck’s monograph.

Post 44-9.jpg

Then to the jig I sorted of copied from Derek to convert the square into an octagon for both the mast (shown here) and the bowsprit using my quite handy finger plane, that once again proved perfect for the job. I’ve mentioned before I’ve never had any luck with planes, but this little jewel works perfectly in making long smooth strokes on the square edge. The key, for me anyway, is to expose very little of the cutting blade on the bottom so it only takes a little wood off per stroke. I’d rather do more strokes than go too deeply into the wood.

Post 44-3.jpg

Then it’s off to the lathe for its first real use. I left enough stock on the end for the chuck to grab onto. I had been concerned (not sure why it was never an issue when I did it with a drill before getting the lathe) that there would be too much wobble not having both ends steady. It proved not to be a problem by using my right hand to steady the end while the left hand did the rounding. I used only various grits of sandpaper, 150, 220, 320 and 400 as I progressed, no tools needed. I took the measurements at incremental points along the stock (here the bowsprit, same thing for the mast) and stopped to check them frequently with digital calipers. I can’t put it back on, better to take it slow and enjoy the massive amount of sawdust it creates.

At least for this task there isn’t a huge difference in the lathe and the hand drill in doing the rounding. The big difference is the quick on/off to do checks, the placement and hold of the stock does make things easier than holding a drill. Some of the jigs I’ve seen for holding a drill are likely just as good, but the Proxxon DB250 is inexpensive and worth the price. I’m sure there is more I’ll do with it later. Another plus pointed out by Derek is the ability to push the wood thru the chuck which though not needed for masts and bowsprits will come in handy later for spars.

Post 44-8.jpg

Post 44-10.jpg

The mast is squared down at the top and includes an off center sheave - I did both before rounding the rest of the mast.

Post 44-5.jpg

A quick check for fit. I sat the hull on its final stand temporarily to ensure when mounted there is a slight rise. It’s interesting how long the bowsprit is on a cutter relative to a square rigged ship.

Post 44-16.jpg

Post 44-20.jpg

A check of the mast to make sure with the coat I can get it both level and slightly slanted towards the stern. It’s a little off in the photo, it won’t be when I mount it later. This step turned out to be worth the time, I did have to make minor adjustments, easy to do now, not so easy if I’d waited after all the deck furniture, the winch in particular, had been mounted. I got to make a new mast coat, the first was too small, but that’s ok, making them is kind of fun. This one from boxwood got a few coats of WOP after I was sure of the fit.

Post 44-27.jpg

Another trip to the mill to flatten the area for the mast cheeks, just a .25mm deep cut for now, I will shape in more once I have the cheeks in hand.

Post 44-11.jpg

And with that the bowsprit and mast are done for now, much more to do on the mast later (the photos are a bit out of sequence, I’d obviously cut on the extra on the bottom of the mast before test fitting).

Post 44-18.jpg

The bowsprit has an iron ring (black shrinkable wire wrap did the job) and four blocks. I added the ring and drilled the holes but will add the eyebolts and rings after the bowsprit is mounted. For me it’s easier to rig the blocks off the ship then glue them in (a practice I’ll follow throughout the rigging). The standard commercial eyebolts work in some circumstances on Cheerful, but not all - the bowsprit is one such place. The commercial versions were much too  ’skinny’ to look right so I made four up from 24 gauge black annealed wire.

I suppose everyone comes up with their own way of making these. I tried finding some options on MSW but didn’t really find anything I liked so I came up with my own using various pliers, shapers, cutters, and my vise. I experimented and decided 1mm was the right size so I reversed a 1mm bit in a pin vise. A tight turn, a couple of bends and two cuts and I had it.  It being (once again) my first time making these it took a little practice and rejects. But once I got on a roll, I made a bunch for all the eyebolts on the outer hull and cap rail as determined from the plans.

Post 44-15.jpg

With eyebolts in hand I turned to the quad hands to rig the four blocks. I’m using fly fishing line to seize these and other blocks but will also use regular thread when I want the seizing to be more visible. Here I have the eyebolt (hidden from view on the right) in one loop and the block in the other. I use my standard loop and wrap method for all my seizings, it works for me. I’ve always had a third hand tool for this work, but the newly acquired quad hands is a big step up from those and well worth the expense. The flexible clip arms and having four to hold different things really makes the job easier. A completed block is shown on the far right, but the clip hides much of it.

Post 44-13.jpg

Thanks mostly to Cheerful, the power tool corner of my workshop has become a bit crowded. It’s usually not this much of a mess, I was working on the mill and the lathe at the same time. My shop dust filter was working over-time to clear the room as was my dust mask. The dust buster and broom came out after this photo. The tool chest holds all the accessories required for the power tools and was a Christmas gift from my supportive wife.

Much of this post probably seems mundane, but it accounts for a lot of time. The small ultimately taken for granted steps require lots of attention so they are unnoticed background on the completed model. For now the bowsprit, mast, and rigged blocks go onto the shelf (I have a literal shelf in one of my cabinets with a soft cloth lining) until its time to mount them. The next step, and the last prelude to mounting everything, is rigging the cannons. That will be my next post. It’s a long process to do one, then 11 more after that one.

Thanks for stopping by, the comments and likes are very appreciated.

Regards,

Glenn

In progress: HMS Surprise

Completed: HMS Winchelsea , HM Cheerful (repost), HM Flirt, HM Harpy, Medway Longboat, HMS Pegasus, HM Granada, AVS, Royal Barge, HMS Vanguard, HM Pickle, Fair American, Lady Nelson, Bluenose

  • Author

Post 45

Rigging the Cannons

This is something most of us have done, likely many times. True to form however, rigging Cheerful was a different approach and experience, once again I learned new things. Mostly following the monograph, here’s how I did mine.

post 45-2-6.jpg

First up was making the breeching ropes. I used now historical .035 light brown rope from Syren, fortunately I bought all the required rope for Cheerful long ago. I created a simple jig that would aided me in sizing each rope to 3 inches in length fitted with an eyebolt and ring on either end, an eyebolt and ring within those for attaching to the gun carriage and a brass rod to form the splice for the button. The photo shows the various tools and materials I used.

I’m really enjoying the quad hands, a great upgrade from the old version I’d used for years. As I’ve said before, It just makes things easier. In this instance I wanted the breech line seizing to show, so I used common thread. I was ok with 3mm commerce split rings and eyelets on the line ends, as they are essentially equal to the recommended 28 gauge.  However I made my own larger split rings for the carriages from 24 gauge wire for a heavier look.  Following the monograph, I used a sharp pointy thing to pierce the rope, dividing it into two lines either side, placed that over the brass rod then used watered down white glue to harden it into shape.

Once I’d settled on a process and finished one, I then did 13 more. With those made I attached one to each gun carriage off the ship. Really no need for a jig to do this, it’s just a matter of gluing in the eyelets either side.  I did not attach the splice, I wanted to pull the rope back out of the way when I mounted the guns on the ship.

post 45-2-7.jpg

I mounted the guns using Smith Industries Maxi-Cure Extra thick CA glue, I use Smith Industries Medium CA for everything else but in the case of the guns I want the extra strong bond the Maxi-Cure provides. I applied a small dab on each wheel, held the carriage above the deck (don’t drop it Glenn, don’t drop it…) as I guided it through the port, then outboard by the barrel as I lined it up to the port opening. It’s a dicey moment or two as I set the carriage carefully down onto the deck, first the front wheels then the back. I breath for the first time in 30 seconds then move to the next one. Once the maxi-cure sets I’m comfortable the guns aren’t going anywhere.

Once mounted I attached the breeching rope to the bulwarks and placed the splice onto the button. The size of the splice is set so it’s a tight fit, precluding the need for any glue that would mar the barrel, again guidance from Chuck’s monograph.

post 45-2-21.jpg

Back to the quad hands to make up the gun tackle using Syren .012 light brown rope, small 3mm PE hooks, and Syren 1/8th single blocks. I may not have needed to use all four hands, but it did make it easier by doing so. I loosened everything up for the photo to make it easier to see. The hands hold the block on one end and the hook on the other with the lead line through the seizing line at the head of the block. The rope is looped then seized, in this case using light fishing lure line, or as I like to call it some blond lady’s hair, though hair may be thicker. Through experimentation I learned there is very little space between bulwark and gun carriage eyelets, the tackle needs to be tightly done to fit and it this instance I didn’t want the seizing to dominate.

I know there are many ways, means and methods to seizing blocks, the figure eight loop and seizing is the way I prefer. I would like to sort out how @Chuck does it so precise and neatly but until then this is the best I can do, it works for me. I’ve literally done hundreds of these over the years and can pretty quickly knock them out.

post 45-2-2.jpg

It comes off the quad hands as shown on the bottom of the photo. I tie the lead line using half hitches, a knot I can slide tight to the block and firm to the line. I had tried seizing here as well, but it took up too much of the limited space on board so I switched to the half hitches. Once I did one I did 27 more, ok really like 34 more, I didn’t like how some came out.

post 45-2-2-2.jpg

Then it’s time to make up rope coils. I have done the flemish coils (or whatever they’re called on a prior model and I may do frapping on a future one. In this case I wanted natural looking coils that vary in appearance as though done by different gun crews and left laying out of the way semi-neatly but not Admiral’s inspection ready. So that’s what I did using line wrapped four times around a dowel, wet with very watered down white glue so as not to cake. Taken off the dowel after drying and trimmed I then basically mashed each with my finger to get what I wanted. I made more than the 28 needed to get what I wanted - the mashed finger approach is not a precision method.

post 45-2-26.jpg

The hooks of each tackle were connected to both bulwarks and carriage and gently tightened. As you can see there isn’t much space to work with. To be clear though, this is not a scale problem, I checked it with mini-me:-). The blocks are the appropriate size, the carriages of the carronade are just shorter and smaller than a cannon of that scale and of course the guns are completely drawn in tight to the bulwarks. I’m going to miss Syren rope, it is so authentic appearing. I suppose some day I’ll have to learn to make it with a rope-walk like many do and many more will do with it no longer being a Syren offering.

post 45-2-42.jpg

The running line is snipped and glued to the deck with CA with the coils then the coils glued on top with Aliphatic Resin for it’s colorless appearance and longer setting time, allowing me to position the coils such that they appear to be a continuation of the tackle (I know, gun rigging 101).

post 45-2-30.jpg

post 45-2-28.jpg

And with that the carronades are mounted and rigged, the cannon at the bow will wait until the next step of installing the bowsprit and winch. The tackle is already complete, I just need to take stock of the limited space.

Next up is mounting the deck furniture I made up long ago and that will be it for finishing the hull.

Thanks for stopping by, the comments and likes are very appreciated.

Regards,

Glenn

In progress: HMS Surprise

Completed: HMS Winchelsea , HM Cheerful (repost), HM Flirt, HM Harpy, Medway Longboat, HMS Pegasus, HM Granada, AVS, Royal Barge, HMS Vanguard, HM Pickle, Fair American, Lady Nelson, Bluenose

  • Author

Post 46

Completing the Deck

I built all the remaining deck furniture some time ago, now the time has come to mount it on the deck.

post 46-4.jpg

The first step is the tricky one of aligning the bowsprit bit, bowsprit, and windlass so they all connect in the right spots with  the bowsprit in a straight-line with the hull. This is compounded by ensuring the right distance from the forward hatch and ensuring there is room in the crowded port bow are for the long gun.

post 46-2.jpg

The placement of the bits drives everything else. Once carefully marked and checked about ten times, I glued them to the deck with the bits having a brass rod inserted in the bottom of each post and drilled through the deck.  I have a spacer held by the clothes pin on the stem, the weight to press the bits tightly to the deck, and tape to keep the bits lined up tight to the bow sprit. This is another of those take a deep breath moments, it’s get it right or start a new model time.

post 46-6.jpg

As I’m coming to the close of the majority of the building it dawned on me how many different glues I’ve used on this model. Each of these has served some specific purpose and has been the glue that holds the project together …see what I did there. I use Smith Industries CA glues exclusively and have for years, you can find it on Amazon if you’re interested. My bottle of Admiralty Paints White glue has served me equally well over a number of models. Of course most know Tite-Bond, I like this version because it dries clear and sets up at about the right speed for me to be able to position things properly.

post 46-19.jpg

With the bits set next up is the windlass (not really sequential, as noted all have to be lined up together). I have fake bolts on the deck furniture, this was the opportunity to actually have bolts serving a purpose. So after careful positioning the windlass I drilled thru it and the deck and locked it in temporarily with 24 gauge wire. I then removed it to give me room to mount the two chase guns in the bow. As many have noted, the location of the port gun doesn’t make a lot of sense since there is no room to work it, but it looks right sitting there from an overall cosmetic perspective, so there it sits. Once the guns were mounted I replaced the windlass, glued it down, and snipped the wire, creating two new “bolts.”

post 46-22.jpg

I’m quite fond of WOP, my deck has multiple coats, I’ve learned however it doesn’t bond well with other parts. Under the bits and all the deck furniture I first used my chisel and  #11 blade to scratch and rough up the service of both the item I was gluing and the deck where it was going. The challenge being to not mar any visible areas. The galley chimney serves as an example but I did the same thing on all the deck furniture. Once again I used weathering powder on the chimney, though this time I used Soot instead of Rust brown. It gave the wood much more of a metal look. As I’ve said before I’ve become a big fan of O’Brien’s Weathering Powders and my pack of specialty soft brushes.

post 46-3.jpg

post 46-5.jpg

Next up was the winch, again careful alignment for distance from the mast, but easier to manage than up at the bow. Brass pins beneath the posts drilled into the deck. I want to make sure anything that will have rigging is firmly fixed. Tight Bond was used for all the deck furniture along with the pins.

post 46-5.jpg

With that the bow and midships area is complete. I also added the elm tree pumps in front of the companionway but forgot to take photos. After I took the photos I decided to replace all the line of commercial eyelets and ring bolts along the length of the deck with my own using 24 gauge wire giving a beefier look. Time to do some rigging.

Thanks for stopping by.

Regards,

Glenn

In progress: HMS Surprise

Completed: HMS Winchelsea , HM Cheerful (repost), HM Flirt, HM Harpy, Medway Longboat, HMS Pegasus, HM Granada, AVS, Royal Barge, HMS Vanguard, HM Pickle, Fair American, Lady Nelson, Bluenose

  • Author

Post 47

The Completed Hull

It’s been a year almost to the day since I pulled out the starter kit, plans, mini-kits, and unmilled lumber to begin my build of HM Cheerful. At that point, as I read through the well written and photo supported monograph, there were so many things  that I had absolutely no clue how I was going to do. It has been an adventure, I learned how to do all those things.

post 47-1901.jpg

post 47-0272.jpg

post 47-0298.jpg

post 47-0302.jpg

post 47-1900.jpg

post 47-1903.jpg

post 47-1906.jpg

post 47-1907.jpg

post 47-1908.jpg

post 47-1909.jpg

post 47-1911.jpg

I thought it worth a moment to pause and share a few photos of my build of Cheerful. I pulled out the gear from my other hobby, photography, to try and do her a bit of justice. The bowsprit was still installed in temporary mode and the mast is far from finished but there for contrast in one photo. So without further comment, here she is.

Regards,

Glenn

In progress: HMS Surprise

Completed: HMS Winchelsea , HM Cheerful (repost), HM Flirt, HM Harpy, Medway Longboat, HMS Pegasus, HM Granada, AVS, Royal Barge, HMS Vanguard, HM Pickle, Fair American, Lady Nelson, Bluenose

  • Author

On to the rigging stage, 11 more posts to go.

Post 48

The Masting & Rigging Begins

A new stage of building has begun. With the hull complete its time for the masting and rigging, beginning with the bowsprit. . I kind of enjoy this part of the model, and once again (he said again), Cheerful is taking me into new territory.

post 48-4007.jpg

The bowsprit bobstay and guys, or as someone with my level of nautical knowledge calls them, the bow stringy things, require both served line and thimbles. So there was a pause while I assembled the Syren Serv-O-Matic I’d purchased a long while ago. It was time consuming and not at all fun removing all the char from each piece, but Chuck is right in the instructions to encourage us to do so, it does look much better once done and coated with WOP. Now to figure out how to use it, I thought it would be more complicated than the simple instructions explain. Turns out it wasn’t - its the perfect machine to serve rope quickly and easily. My first effort, I thought would be practice, was good to use, it takes no more effort than turning the crank and a steady hold on the thread.

post 48-4003.jpg

Next up are the thimbles. I found this nifty brass tube cutter at Rio Grande Jewelery which has a number or handy tools for modelers. It comes with a handle but I removed that and mounted in on my vise. It proved to be an excellent way to quickly generate short lengths of very thin brass tube with a neat cut. Just set the length with the screw, hold the lever down with one hand, place the jig saw in the slot and cut. My $17 jig saw proved its worth once again, completing as many as I wanted to cut without fail or issue - a very fine tooth blade was used.

post 48-4005.jpg

I found that a spring loaded punch was much more effective at consistently generating an even “fold” on the both sides of the brass tube to create the thimble. While of course a hammer and regular punch work fine, I more often than not crushed one side or the other - why practice my hammering skills when the $8 spring loaded version does the job. After creating a number of them in different sizes I blacked them using my standard process.

post 48-4012.jpg

I have plenty of commercial hooks, eyelets, and rings - and I’m not using any of them. In fact I pulled off the ones I had placed earlier (down the center of the deck) and replaced them with home made versions, mostly of 24 gauge black wire. The heft of these on a 1:48 scale model is noticeable. After some practice and a bit of wasted wire, I have my own way of knocking out all the eyelets, rings, and hooks I need for Cheerful.  It was good I did because the thimbles require a hook with a larger eyelet to connect the hook to the rope.

post 48-4069.jpg

I learned my rigging technique from Bob Hunt’s practicums, his AVS was my first model many years ago. The “fishing lure” method of seizing has served me well, but I thought I’d look at other methods and did a little research. I came to the conclusion that while there are in fact many ways to seize lines and strop blocks, after experimenting with a few of them I’m content to continue with the one that I’ve been using. With two additions: Thanks to @Delf in some instances I’ll use fly tying line and in others I’ll continue to use 50wt Gutterman poly thread.


My only issue with the fishing lure method has been the small thread ends that were left despite my using high quality Gingher embroidery scissors. I now have the answer to that by using extremely sharp and close cuticle cutters, my newest ‘tool’ investment. They are so flush and sharp they can also cut the wood of the block, which I did and consequently had to replace, so care is needed. I also vary the use of watered down white glue, hypo-cement, and CA depending on the situation.

Finally, I have a bunch of empty thread spools to transfer Chucks now historical rope, marked with the size. Not sure what I’ll do when these go empty for the last time, maybe a Rope Rocket in my future, but not for this model - I have what I need.

post 48-4030.jpg

And off I went. The bowsprit collar is shrink wrap plastic (but I also use black card or black masking tape). The rings in this case are made from 22 gauge black wire for some extra heft. The blocks are seized to the hooks with fly fishing line while the served rope is seized with 50wt poly thread. The hooks have larger eyelets to accommodate the thimbles. Of note these where done before my “discovery’ of cuticle cutters, but I didn’t want to go in there after the fact for fear of cutting off more than I wanted to cut in such close quarters. This is one of this macro-hi-res photo things. I didn’t even notice excess thread until I looked at the photo for this log entry.

post 48-4048.jpg

Here’s the bowsprit end of the bobstay tackle and guys, naturally I’m using blocks from Syren.

post 48-4046.jpg

post 48-4028.jpg

And the bow side view of the same. The bobstay is belayed, but loosely, like most I don’t tension the lines completely until later. The guy lashing took some experimentation and research, none of which was definitive, I learned many different techniques were used both by modelers and on the actual ships. In the end I opted to seize the line at the bow eyelet and tie it off at the center after two loops through the guy thimble and seize the running end past the knot (essentially a ships bend). And…I remembered to put on the traveler before the blocks, so it will just hang there a while.

Next I turn my attention to the mast.  Thanks for stopping by, the likes and especially the comments are always welcomed and appreciated.

Regards,

Glenn

In progress: HMS Surprise

Completed: HMS Winchelsea , HM Cheerful (repost), HM Flirt, HM Harpy, Medway Longboat, HMS Pegasus, HM Granada, AVS, Royal Barge, HMS Vanguard, HM Pickle, Fair American, Lady Nelson, Bluenose

  • Author

I'm reminded while reposting although technically a kit there were a large number of typically kit things that had to be made from scratch. Fun it was.

Post 49

The Masts

A few more things to build as I tackled the masts. I described turning the mast with the lathe in an earlier post, the top mast followed the same process so I won’t repeat it here.

post 49-4036.jpg

post 49-4037.jpg

post 49-4039.jpg

The trees proved to be a fun little mini-project, more complex than I had thought. The things we remove from the laser cut parts sheet of a kit this time I made from scratch using three sizes of wood. I cut and shaped the cheeks from 3/64 wood, flattened the sides of the masts and attached them. I cut out the bows of the tree from the plans and glued them to 1/8 wood and rough cut them with the scroll saw. I’m comfortable cutting outside the edges, I’d rather sand it to the proper shape, but the scroll saw makes that so much less work to do. I sanded the outside curve with my Byrnes sander then back to my various sanding tools to get the inside curve proper.

post 49-4042.jpg

Using extra long 3/32 wood cut to size I added the three required slots using my now trusty mill. I’m so glad I bought the MF 70, it’s more than proved its usefulness during my build.

post 49-4053.jpg

A quick assembly of the parts matched up to the plans then came the tricky, and as my British friends say, fiddely part.

post 49-4056.jpg

post 49-4055.jpg

Adjusting the cheeks and mast so that the trees are parallel to the deck consistent with the aft rake of the mast takes a bit of time. No magic, just cut file, dry-fit, adjust repeatedly until its right. The key of course is to go slow, as always you can take more off but you can’t put it back on. I used the laser level to make sure the mast was in the right position and bubble levels on the deck and trees adjusting until they matched up.  One thing to remember, with all the attention on adjusting the parallel it also has to remain horizontally level to the deck. Seems obvious but easy enough to forget.

post 49-4062.jpg

I used black masking tape for the mast bands, handy stuff and another Amazon purchase.

post 49-4058.jpg

Another handy tool is this centering ruler, I used it to locate where each of the top three eyebolts, made from 24 gauge black wire, are drilled and glued in. For the bottom mast ban I cut, shaped, and blackened a bit of 1/64 xx 3/32 brass strip. The mast side was simply filed down into a bolt size pin and glued into a drilled hole. This extended bolt is a small detail, but aside from being authentic it really adds to the overall appearance of the trees.

post 49-4075.jpg

The mast cap was another adventure and a reminder about how smart model designers are when they cut parts boards. You’d think rectangular block, two holes, one round one square, done. Which is essentially true but it too has to be cut to be parallel on the raked mast, done. What’s a tad tricker is the distance between the two holes. Despite following the plans the main, top mast, and trees don’t end up being exactly right-sized (at least not mine). The spacing of the holes on the mast cap have to be such that the top mast and mast, again accounting for rake, are also parallel to each other. Which is a long way to say I had to make a second one when the match to plans version had the top mast with more rake than the mast.  Clearly user error, I sorted it out but the mast cap proved to be more than just a little block of wood with two holes.

post 49-4071.jpg

Back to the mill to cut a nice little 6mm truck for the top mast and we’re done. It all took a bit of time but really was kind of fun to sort out.

post 49-4089.jpg

I painted it all black and added the 4 eyebolts to the mast cap. I rigged the block to the two sides. The fore and aft bolt blocks have tackle attached, so the eyebolts aren’t glued in. I’ll remove them, add the blocks and tackle, and glue them in at an appropriate time. Still nothing glued together at this point, all dry-fitted to ensure it all works. I may not glue the top mast and mast cap onto the mast until after the shrouds and more of the rigging new dropped into the gap between.

post 49-4092.jpg

I turned my attention to the base of the mast, remembering to put on the mast rings before adding the boom rest. I got a little carried away and failed to take photos of the process.

I went a different way with the boom rest, I decided to use my original and ultimately too small mast coat by cutting it in half for the boom rest, I like the look and it was a good fit. Then I added the cleats from Syren after sanding the char and shopping them a bit. Each are pinned by a cut-off kit nail into holes between the cleat and mast. Some of these will bear tension later, don’t want them popping off. And finally I  painted it my favorite red from the boom rest to the deck.

post 49-4017.jpg

I followed Chuck’s recommendation of using a Dremel to sand off the char from the mast rings by attaching them to the centers I removed after. The char was a bit challenging, but I kinda like them like this, distinctive character.

post 49-4096.jpg

I like to rig as much as I can off the boat, so much easier that way. So added the three blocks on the top mast for the eventual stays The port and starboard block need a bit of length given the way the tackle will run, I tried a couple of options then settled on my standard method using 50wt thread but instead of the usual 5-7 turns I added 21. That seem to give it the right heft and length. My new cuticle cutters proved handy for a tight trim, but as I’ve noted before care is required to not cut things you don’t want to cut. I don’t know how many times I’m going to have to learn that lesson.

post 49-4123.jpg

The boom and gaff were cut on the lather the same way as the masts, though I just used a dowel instead of cutting from square stock. The bands are also from black masking tape.

post 49-4121.jpg

I cut the jaws using a jewelers saw, once again with the pattern cut from the plans and rubber cemented onto the wood. I then used the usual practice of rubber cementing the two jaws together back to back and sanding them into identical pieces before adding to the boom (the photo is before all that sanding was completed).

post 49-4126.jpg

Both it and the gaff are painted black still using Admiralty Paints Iron Works Black and onward we go. I’ll now decide it I want to shape the two yards while my work area is a mess of sawdust, or change it up and do some rigging

Thanks for stopping by. The comments and likes are always appreciated.

Regards,

Glenn

In progress: HMS Surprise

Completed: HMS Winchelsea , HM Cheerful (repost), HM Flirt, HM Harpy, Medway Longboat, HMS Pegasus, HM Granada, AVS, Royal Barge, HMS Vanguard, HM Pickle, Fair American, Lady Nelson, Bluenose

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

Recently Browsing 0

  • No registered users viewing this page.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.