Skip to content
View in the app

A better way to browse. Learn more.

Dry Dock Modeler

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.
Welcome to Dry Dock Modeler

HM Cheerful 1806 by glbarlow - Syren Ship Model Company - 1:48

Featured Replies

  • Author

No photos in this one

Post 50

Masts continued

 

I’ve now epoxied the ship to its permanent base and glued in the main mast.  

Both are very anxious steps, after 14 months work I certainly did want either the ship or the mast off-center or unbalanced especially since neither step can be undone or stopped once started.  

First the ship to the base. I had bubble levels at three places on the deck, on the mount, and on the worktop. I rehearsed everything several times before adding the mixed epoxy to the brass rods and pedestals. I had paper towels at hand to wipe the inevitable excess epoxy from the pedestals and keel. With only 5 minutes before the epoxy set, I moved fast but with a light hand. ...Sit the ship on the base, wipe excess, check levels, sigh a sigh of relief and walk away for the night, turn around and check levels again...

 

It was much the same for the main mast, only this time I used a laser level. I hadn’t moved the model from its leveled position and again everything was rehearsed. I knew adding the Tite Bond would make it a tighter fit so not to panic. The challenge here is not so much the rake of the mast, which I checked with a bubble level on the tree anyway, I knew the rake was established correctly way back when I built the frame. The level made sure the mast was straight from the bow looking back but I had to eyeball the left/right orientation of the trees to the deck below. Again rehearsal was essential as I’d established reference marks to key in on looking from above down to the deck.  Fortunately I have a decently calibrated eyeball, and in the end everything came out right.

Now the quandary, do I follow the monograph and next rig the boom? That means also gluing the top mast and mast cap in place. That in turn means seizing shrouds and other mast top ropes on the ship, rather than making them off the ship and simply dropping them into place before adding the mast cap. I’m sure it will be fine either way.

 

It’s a little sad to note that other than some dead eyes, yards, and the anchors, I’ve made all there is to make. Lots of rigging to go but I’ll be finished in a couple of months.  Then what will I do......,

 

Thanks for stopping by, sorry I was too laser focused (see what i did there) to take more pictures of this very critical step. Your comments and likes are always appreciated.  

Regards,

Glenn

In progress: HMS Surprise

Completed: HMS Winchelsea , HM Cheerful (repost), HM Flirt, HM Harpy, Medway Longboat, HMS Pegasus, HM Granada, AVS, Royal Barge, HMS Vanguard, HM Pickle, Fair American, Lady Nelson, Bluenose

  • Author

This one makes up for lack of photos in previous post...

Post 51

Boom & Gaff Rigging

With the boom and gaff made it’s now time to start the full on rigging of Cheerful. I enjoy this part of the build process, it’s fun to work from the plans, determining rope and block sizes and the routes and lengths to organize the complicated block and tackle arrangements, each one serving some specific purpose. I like the look of the ropes running about, it’s one of the main reasons I like building sailing craft, though fully rigged Cheerful will have a whole lot less lines than I ran for Pegasus. It’s kind of amazing to know that ships of this time period relied completely on wood, canvas, and rope to move the ship. It must of been an orchestra of coordinated movement to haul lines and arrange sails to propel the ship across the oceans. Anyway…

post 51-4151.jpg

First up are two thimbles rigged to the gaff for the peak hall. This is different than the more common method of seizing blocks. To the thimbles will be attached block seized hooks. A little more complicated to make but really fun to do. I described making thimbles in an earlier post. The spring loaded punch makes this a breeze, the set I have allows for a pressure/tension adjustment, with a little experimentation I got the right amount of punch to get an even fold of the brass with just one push punch to each side, no hammer required.

post 51-4146.jpg

I seized the thimble centered in a length of .018 dark brown rope on my Quad Hands then crossed the ends and added a loose seizing. I’ve mentioned after experimenting with other methods I came back to my Bob Hunt learned approach of turning the thread much like many us learned as kids to tie a hook on a fishing line. Seven turns is my choice for no known reason other than its not 6 or 8.

post 51-4147.jpg

With this rig placed over the gaff and pulled tight, glued with watered down white glue, then trimmed with my cuticle cutters I have my gaff rigged thimbles.  I also attached whatever blocks I could to both the boom and the gaff before proceeding with the rigging. I rig whatever I can off the ship where its much easier to manage .

post 51-4156.jpg

Never having met a tool I didn’t like I also added the top heavier cutter to go along with my cuticle cutter (bottom) and Gingher embroidery scissors (note none of the three are actually for modeling, my experience is jewelers and sewing have the best tools, and now apparently so do pedicurists).

No judgement intended, the use these three tools are all good and will vary between users but I do like the cuticle cutters best for trimming, though my embroidery scissors are also heavily used in rigging, they are so sharp I just get near the thread and it trims itself. The toe nail clippers do have a solid reliable use for heavier cutting where absolute flush is required, but for me personally it would rank third. With these new tools I quickly abandoned other seizing methods, being able to closely trim around seizings.  Or maybe its just the old dog, new tricks problem.

post 51-4187.jpg

Back to rigging. I tied off the boom to the boom rest using some boxwood parrel beads I happened to have. They were the perfect match to the ship to complement my character driven (that’s what I’m calling them….) boxwood mast rings and cedar mast.

post 51-4154.jpg

post 51-4161.jpg

post 51-4197.jpg

Using .025 light brown line I rigged the topping lift. It runs up to the mast cap and then connect to tackle using .018 rope connecting to a hook at the base of the mast and belayed to the pin rail. All lines are not glued to the belay points and are left long enough to release and re-tension later - hence a lot of string on the deck.

post 51-4158.jpg

The Quad Hands is quite handy at working up high, in this case the tackle block for the topping lift. I purchased an additional 16” arm making it even easier. It is having this tool I chose to go ahead and add the top mast and work in the monograph sequence of rigging inside out, knowing I can manage adding the shrouds on board instead of slipping them on before the mast cap was glued on. Other than standing up and being careful not to break the trees, it’s only a little more challenging than working off the model as has been my past practice.

post 51-4172.jpg

By now I think I’ve established my zest for tool acquisition (sad I know) but in these simple home made tools make belaying and running lines in crowded places much easier. They are nothing more than sewing needles withe the head cut off and the remaining ‘V’ filed and sanded smooth  (otherwise I’d shred the thread) glued into a 6 inch wooden dowel. I’ve had these for years, they work great for me. The different lengths of the V’s serve different purpose, but always for rigging.

post 51-4175.jpg

post 51-4188.jpg

I had earlier loosely ran .018 light brown line through the triple blocks (one to the boom and the other to the horse above the tiller) for the main sheet before I completed the topping lift. Easier to get there now while the boom is just flopping around loose.

I wasn’t exactly sure in what order to rig these two triple blocks. I had acquired Petersson’s Rigging Period Fore and Aft Craft from Amazon Kindle and downloaded it to my iPad a while back. The first section is specific to English Cutters and is mostly detailed diagrams for key sections of rigging and specific to cutters, it is very handy and what I followed to rig the main sheet. One interesting point is how the running end passes through the center of the two blocks before being belayed to a cleat.

post 51-4183.jpg

After tying off the gaff to the mast using more of my boxwood parrels I chose to next add the throat halliard with more .018 line. Out of sequence with the monograph I found it easier to have the halliard holding the gaff in place a bit. While I was rigging the peak halliard this was left very loose, I only tensioned it after all the gaff lines were run. There is no need and every reason not to tension lines that work together (like for the gaff) until they are all run and can be slowly tensioned together in my opinion.

post 51-4203.jpg

The peak halliard requires .018 line with six sets of block and hooks with .012 line tackle at the deck. I’ve mentioned I have plenty of the commercials versions of hooks but elected to learn to make my own. I’m sure they aren’t the best in the world, in fact I’ve since learned to make them a tad shorter, and they certainly are nowhere as nice as Chuck’s (or many others) but I like them. Enough that I’m sharing a couple of those shown as macro photos. A so very close view you won’t really see in reality but are fun to show. I’m sure with practice I can make better ones, however at this point I choose to be consistent with the size and look.

post 51-4191.jpg

For the peak halliard I chose to work backwards from the monograph’s detailed description. I stared with the tackle made off the ship (there I go again) and run the lines up through the blocks back to the belay point on the mast. That allowed me to more easily adjust the tackle block to be even with the topping lift block on the port side….at least for me it did.

post 51-4193.jpg

This photo demonstrates the superb quality of Syren blocks and now discontinued rope) along with some less distinguished hooks. I’m going to miss ordering Syren rope, not sure I’m that excited about making my own. Fortunately something I can delay until after Cheerful is done.

post 51-4185.jpg

The completed peak halliard is one of those distinguishing looks on many ship models, it is one really long line run from a block and tackle hooked to the deck, back and forth through five blocks up high, then belayed back to the deck. It takes some patience and time to obtain the right angle on the gaff, this angle also affects how the rope looks (geometry, angles, and all that stuff). I marked a spot on the mast with gaffer tape I determined from the plans as a level line straight across from the tip of the gaff. I placed a bubble level on the wide side of my long metal ruler to transfer that line from the plans to the ship. Of course I could have winged it and been close enough, but where is the fun in that. Then it’s pulling here, a tug there, through the six blocks until the line looks right. It is critical to not over tension or pull too hard at one spot. Chuck’s blocks are great, but its a hole in a piece of wood, not a working pulley.

post 51-4180.jpg

Like the topping lift, the peak halliard has similar tackle on opposite sides the peak to starboard and the topping to port. The peak halliard tackle runs to a block hooked to an eyebolt on the cap rail and belayed to the pin rail. The throat halliard is simpler, running directly to a belaying pin on the port pin rail.

post 51-4189.jpg

With the flag halliard added and temporarily tied off at a cleat on the stern (wow, how long ago did I install that cleat….) the running rigging for the boom and gaff is complete. That was fun. Next up the Burton pendants and adding those shrouds.

Thanks for stopping by, your comments and likes are always appreciated. I’m especially glad to learn that some find the log helpful as a reference for their own builds. Like everyone that’s how I learned and I enjoy trying to pass that on. Once more I thank @Chuck not only for this model, plans, and monograph but always being there when I have a dumb question to ask. I imagine him shaking his head as he provides the answers so…Cheerfully…


Post 52

After looking at my photos I decided I didn’t like the hooks, so true to form I took them off and replaced all of them.

post 52-4210.jpg

post 52-4211.jpg

post 52-4213.jpg

I suppose it’s subtle in the photo, but nonetheless they are all re-made and replaced. Time for me to stop staring at photos and move on.

Regards,

Glenn

In progress: HMS Surprise

Completed: HMS Winchelsea , HM Cheerful (repost), HM Flirt, HM Harpy, Medway Longboat, HMS Pegasus, HM Granada, AVS, Royal Barge, HMS Vanguard, HM Pickle, Fair American, Lady Nelson, Bluenose

  • Author

A reminder, I don't know if the links still work, maybe some do and some don't

Post 53

The Rigging Continues

post 53-4264.jpg

I had never served a rope on any of my previous models I’m sad to say. In fact as I was starting Cheerful last year I wasn’t sure I would on it either, I wasn’t sure I wanted to get into it. During this phase of the construction I served a LOT of rope in multiple lengths. The @Chuck Serv-O-Matic makes what I thought would be complicated really not any more difficult than loading it up and turning the crank, and turning the crank some more and then some more turning of the crank. If you’re not sure yourself above serving rope, I highly recommend you get this machine and serve away. It’s easy and, so far, none of my served ropes have sprung into an uncoiled mess, I not yet.

I also prefer now historic Syren Dark Brown rope instead of black for standing rigging and determined Guterman 100% polyester #593 (Seal Brown I think) is a good match and what I loaded on the server. Also, I discovered a sewing machine needle (vs. regular sewing needle) comes in handy for starting the thread through the rope with the threading on the pointy instead of at the back of the needle.

Shrouds

Right up front let me say there are many other ways to set shrouds, many of them likely better than mine. My method is an amalgamation of what I’ve learned from the many great builders on this sight and my own experience in having done a few on nine prior models. I doubt my method is the best choice for many, still I’ll share it here nonetheless.

post 53-4220.jpg

With the able Quad Hands on my bench I decided to install the shrouds after the mast was stepped. I followed the common practice of alternating sides by pair: fore starboard, fore port, stern starboard, stern port. The forward shroud on both sides is served its entire length, the others shrouds are served to just below the cheeks. Many cranks of the serving machine were enjoyed.

post 53-4243.jpg

I used the same seizing at the masthead and the deadeyes. I chose .012 dark brown rope instead of thread because I wanted the shrouds to show a bit of heft. After 10 turns and finishing fishing lure style I crossed the two running ends to the back side of the seizing and tied them in a square know then sealed the knot with a drop of CA (I don’t want these breaking loose, the back side isn’t really that visible.

post 53-4233.jpg

I really enjoy building models of sailing ships, I do not however enjoy installing deadeyes all that much (or worse the still to come ratlines). Many modelers have many methods and I wish you all well in whatever manner you choose. I start with a jig that includes a sacrificial deadeye glued on and two brass pins at the required distance below inserted into the deadeyes already on the hull. A piece of tan thread is tied by clove hitch onto the shroud and used to mark the bottom center of the loop made by the jig (after a lot of fumbling about).

post 53-4234.jpg

That loop is transferred to the closely located Quad Hands and the shroud dead eye (temporarily upside down in the photo) tied end by crossing from back across the front and then seized with a clove hitch.

post 53-4236.jpg

With the running length temporarily seized with another piece of tan rope with another clove hitch the shroud is tested with another jig, this one with brass pins on both ends at the required distance.

post 53-4238.jpg

Once the length is confirmed and set, the clove hitch is glued at the dead eye and three seizings, as described above, are added then the running length trimmed at the top of the third seizing.

post 53-4246.jpg

The lanyard is added and temporarily tied by half hitch just above the first seizing. That’s one done, seven more to go.

I’d like to say its as smooth as described it, but for me it isn’t. Getting all eight the right length is a lot of fumbling and fiddling about and very time consuming. How did I ever do 74 of these on Pegasus, I was younger then.

post 53-4275.jpg

Eventually though it gets done and I can finally move on. I’ll do a little twisting about to clean them up more when I permanently tie off the lanyards.

Burton Pendants

-post 53-4217.jpg

The two Burton Pendants were actually the first item installed over the mast head, before the shroud lines. The standing portion is fully served and runs about a third of the distance down to the deck. The tackle is hooked to the cap rail and belayed to the pin rack. The challenge was having the each pendant equal distance from the masthead. No cranes on these ships, the pendants did all the heavy lifting.

Lower Backstays

post 53-4258.jpg

On to more fun rigging beginning with constructing two fiddle blocks from Syren. They consist of three layers that need to be lined up. I squared them up using their frames and glued the three layers together, once dried I trimmed away the frames and sanded them, removing the char and shaping them a bit by rounding the edges.

post 53-4270.jpg

The fiddle blocks look pretty cool rigged up, I sorta wish there were more than just the two as part of the rigging.

post 53-4280.jpg

After installing some long pendants, served only around the mast head and ending in a block tackle was added using the fiddle block, two hooks and another block. These are terminated using two of straps added so long ago on the side of the hull and belayed to a cleat next to the ladder. The plans show the two hooks facing each other, I’m not sure why so I just followed the plans. The third strap is for the upper back stays I’ll add later.

After the choir of the shrouds the backstays were a bit of fun, like the Burton Pendants the main challenge getting both port and starboard stays to match in length with placement of the block and fiddle block.

post 53-4288.jpg

The ship is starting to have a lot of blocks and strings running about. Of course the mess on the deck and the alignment and tension of the lines will be adjusted later. How long ago did I plank that deck…

Lower Yard Sling

This was a fun little project in and of itself. Routed around the masthead and terminating in a thimble with a hook, it will hold up the lower yard.

post 53-4295.jpg

post 53-4296.jpg

I mentioned this brass tube cutting tool earlier, Out it came again to cut some tube for the sling thimble. I cut a couple of different sizes as I wasn’t exactly sure which I’d used (I settled on 1.75mm). I learned to hold the brass down using the knurled knob with one finger and covering the cutting area with another so the cut piece doesn’t fly off somewhere. With the right tension adjustment in the spring loaded punch I created the thimbles and then blackened them. I was having too much fun and so made a bunch, I’ll need them someday.

The sling rope is served its entire length with the thimble seized at the center. I made a hook with a larger eye to fit into the thimble. Here I had to make a decision. The monograph has the the sling meeting in the back center of the mast head, but notes many ships instead had them meeting on the port side. I opted for port, the main reason being it’s getting pretty tight back there with all the served lines needing to be below the throat halyard eyebolt, more room to work on the side of the shroud gang.

post 53-4297.jpg

I seized an eye on one end off the ship after measuring the distance with a prototype sling seen here (not served and with a temporary thimble). The goal is to have the hook just below the parrels of the gaff. The first eye I could do with the sling off the ship.

post 53-4301.jpg

Then the fun begins, determining the location of the second interlocking eye. I did this by looping the loose end through the completed eye and setting the center of the hook on the mast. A clip removed from the quad hands provided a little weight to hold the hook at the bottom center while I adjusted the length. Yet another piece of tan rope tied in a clove hitch held it all in place until I had the right length. Notice by served line is extra long, more than needed but a few more cranks on the serving machine was better than coming up short.

post 53-4302.jpg

Then it’s working in the tops to seize the second eye interlocked in the first eye so that completed the hook hangs at the right length and lays nicely on top of the port shroud gang. Though it took some fine work to do this without breaking anything, it proved the be rewarding when, as a result of careful planning, it came out right the first time (not everything I does).

post 53-4304.jpg

Working on the ship up high in the tops is made possible by the Quad Hands, the old third hand I had is a joke compared to this tool. I like the middle size plate augmented with a third 16” hand (for a total of five) bought separately. Here it is assisted by a box - one I got in a bit of trouble for when my wife walked by and asked what I was doing with her nice linen covered box from her sewing room. Fortunately both the box and I came out unscathed.

post 53-4307.jpg

The completed sling came out just right for me, the lower yard will be happy to fine it supportive of its position on the ship, or so it would say if yards and slings could talk.

post 53-4305.jpg

The mast head is getting crowded with just the main stay to add. I think here is where serving all that line pays off, perhaps especially at 1:48. The shroud gang though packed in tight, looks pretty cool to me. I’m also pleased with my decision to connect the sling on the port side, those eyes are better accented here than behind the mast in my opinion.

Now to the main stay and then see how long I procrastinate before starting the ratlines before finishing out the mast rigging.

Thanks for stopping by, your comments and likes are always appreciated.

Regards,

Glenn

In progress: HMS Surprise

Completed: HMS Winchelsea , HM Cheerful (repost), HM Flirt, HM Harpy, Medway Longboat, HMS Pegasus, HM Granada, AVS, Royal Barge, HMS Vanguard, HM Pickle, Fair American, Lady Nelson, Bluenose

The rigging looks fantastic.

If I see the rigging of your Cheerful, I think that I have to build a model in a smaller scale. In 1/36 I can not rig the models., because I do not have the space. Perhaps it is possible if I build the Speedwell or one of her sister ships.

Regards Christian
in the shipyard: Hayling Hoy, 1759 - scale 1/36
on the drawing board: English Ship Sloops Fly, 1776; Comet,1783; Aetna, 1776; Granado, 1742; HM Cutter Alert, 1777; HMS Triton, 1771
"Have no fear of perfection - you'll never reach it." Salvador Dali

Thanks for reposting this log. Cheerful is probably my next build and this was one of best logs for it on t'other forum.

Edited by mnewsholme

  • Author
59 minutes ago, AnobiumPunctatum said:

I think that I have to build a model in a smaller scale. In 1/36 I can not rig the models., because I do not have the space.

Thank you! As a cutter Cheerful at 1:48 is about the same size and height of a frigate at 1:64. I also built Winchelsea, a frigate, at 1:48. No way could I ever mast or rig it because of space so I get it.

Regards,

Glenn

In progress: HMS Surprise

Completed: HMS Winchelsea , HM Cheerful (repost), HM Flirt, HM Harpy, Medway Longboat, HMS Pegasus, HM Granada, AVS, Royal Barge, HMS Vanguard, HM Pickle, Fair American, Lady Nelson, Bluenose

  • Author
23 minutes ago, mnewsholme said:

Thanks for reposting this log.

Thank you! It's a bit of an ordeal to repost, still it's kind of fun to revisit it as I do.

Regards,

Glenn

In progress: HMS Surprise

Completed: HMS Winchelsea , HM Cheerful (repost), HM Flirt, HM Harpy, Medway Longboat, HMS Pegasus, HM Granada, AVS, Royal Barge, HMS Vanguard, HM Pickle, Fair American, Lady Nelson, Bluenose

Thanks so much for posting your rigging photos! I forgot just how well you documented your rigging in your original build log. These photos will prove invaluable for me since I'm at that stage of my Cheerful build now.

Erik

  • Author

And here we go again with the repost - I'm amazed and what I was amazed about just 6 years ago, its fun reading this again.

Post 54

The Main Stay, Foresail Halyard, and Jib Halyard

It bears saying again. I am grateful for all the build logs on MSW. I learn so much from so many, I hope my log helps others as I’ve been helped.

And back to work, though work has slowed down lately. I think I’m either reluctant to reach the finish line or procrastinating because ratlines are now on the agenda. I do not like ratlines, Sam I am. The good news is there are only eight total shrouds so how long could it take…I don’t know because I haven’t started them…

The Main Stay

post 54-623.jpg

It’s just one ‘string’ but the main stay takes some time and thought to get right. It’s served around the mast and to just below the eye so I did a bit of measuring to determine where that was. There is no precise definition of where to form the eye, I just eye-balled were to close it with the .054 Dark Brown rope used on the stay. I found a black grease pencil useful for marking the dark brown rope (or China marker I believe my Brit friends say). The black is hard to see but there is no chance it will show through the serving, so I prefer it to a brighter color. The measurement is a little tricky, the stay sits on top of a lot of other rope on the main mast, it’s important to make sure it’s seated snugly. The sling wants to get in the way so I had to check and recheck for a proper fit.

post 54-4312.jpg

Of course I served the stay extra long even with the measurement, why not. Cheerful does not have a mouse on the main stay, instead it is a seized eye. For me though this particular seized line required a different approach than my other seizings. In part because of the large .054 served rope and because it’s very visible, I wanted it to look good. My normal seizing technique just wouldn’t work to my satisfaction, so having marked where I wanted I cut the end of the served line at a sharp angle (using the toe nail clippers, here they exceed both cuticle cutters and scissors). Important obvious note, the serving has to be sealed so it doesn’t explode as its cut. I elected to use CA to seal the end of the serving since the cut would be covered by the seizing. I then glued that angled cut to the running length of the stay, again using CA.

post 54-4318.jpg

BEFORE I did any of that I added the foresail Halyard block very loosely seized to the stay. This block, along with the tackle seized to the block are fitted to the main stay inside the loop and close to the trees. Even with the quad hands this would be a difficult block to add after the fact to a completed stay with its awkward position. It was SO much easier to slip it on before closing the eye, you can see it unfinished two photos above and the block seizing completed after the main stay is installed.

post 54-4313.jpg

(failed focus on this photo) To do the main stay seizing (you can see that loose foresail block in this photo as well ) I started by tying a square knot with 50wt polyester thread just below where I had glued the eye. I had used .012 rope on the shrouds and deadeyes, it would just be too heavy here, the thread is a better look. I left enough of the short end to pass up the center of the seizing then proceeded to wrap with the long end until I was far enough over the splice to suit my eye. I’m normally big on precision with the number of wrappings, but here I just stopped when it looked right. Actually I went further, decided it was too much and backed up. I tied another square not with the remaining long end and the shorter end on the bottom where it won’t be seen. I painted it with watered down white glue and there I have the main stay eye.

post 54-4319.jpg

Then to the other end of the stay, I turned in the large 5 hole deadeye purchased from Syren just as I did the shroud deadeyes, clove hitch at the base and two seizings above per the plans. Here I went back to  .012 rope because for the “heft.”

post 54-4365.jpg

The seizing of the lanyard is also a bit tricky. I ran a .025 lanyard connecting the stay to the stem, those 5 holes on the stem are finally used after the stem being one the very first things added to the ship so long ago. To finish it off required a single hitch above the first seizing on the stay, then the running end of the lanyard seized to the stay. No problem, except all that is kinda hanging in the air and that hitch has to be kept taunt. I could have employed the quad hands, but room to work would be tight. Instead I tied up the lanyard far up the stay with one short piece of tan rope and tied another to hold the loop of the seizing thread while I passed it around the stay between the seized loop. In the photo I was using 50wt thread but after completing that I decided it was too heavy so I cut it off and re-did it with the fly tying thread I’ve used to seize all the blocks. Just a quick moment to thank @Delf for the fly tying thread. I admit I was a bit skeptical at first, but since then I’ve seized almost every block on the model using it. It, to me, provides the right look and scale, it is well worth the not insignificant effort to see it while doing seizings. I didn’t really find what I wanted on Amazon especially for a color match to the light and dark brown rope. Instead the thread came from some random fly fishing website from a google search.

post 54-4371.jpg

Here is the finished stay at the lanyard end. Please note the proper stopper knot ripped from the pages of my Ultimate Book of Everyday Knots, a book I recommend for everyone even outside model building, Amazon has it.

Foresail Halyard

Next up is the ratlines, wait I can put that off a little longer, next up the foresail halyard.

post 54-4381.jpg

Having seized the block on the stay earlier this was now pretty easy. The running length goes to a block seized with a hook attached to an eyebolt just behind the stem (so that’s why I put that eyebolt there so long ago).

Another note that I’ve said before but bears repeating. Not every eyebolt/belaying point are highlighted early in the instructions for most any model. I always look ahead to the rigging section and study the plans for these early into the build. They are frequently so much easier to add before the deck gets crowded and room gets tighter.

The running length runs down through that block, back up top and belays to a cleat at the base of the mast. This is makes for a really long piece of .018 rope. The challenge for this halyard is to balance the tension on the line enough so that it looks right, but not so tight that it’s pulling the stay out of alignment or into an award pulled out look. The halyard doesn’t really need to be very tight and over tightening doesn’t gain anything.

And now for the ratlines - no wait I can still put it off.

Jib Halyard, In-haul, and Out-haul

post 54-4361.jpg

This one is fun. Three distinct tackle runs that work in sync with each other to manage the jib. I made up all three as a first step knowing I’d have to install them as a working unit.

post 54-4379.jpg

A .018 line seized to a block at the mast cap runs down through a block seized to a hook. That hook is seized to the hook on the traveler ring I had remembered to add way back when installing the bowsprit. It’s just going to flop around there for a minute. On a side note, the mast is looking pretty cool with all those served ropes.

post 54-4373.jpg

(another focus problem, I’m getting sloppy) The out-haul starts a stopper knot (again from my book of knots, I normally just do a figure eight knot when a stopper is required, but this and the main stay lanyard are very visible so I wanted it to look right, runs from the traveler ring forward to the sheave cut into the bowsprit (so that’s what that’s for) back to the fixed block I’d made on the starboard side of the stem and up and over to be belayed to the bowsprit bitts starboard post.

Finally, the trickiest of three lines, the in-haul, is actually two ropes joined together (no thimble this time). It requires a V with its ends tied to either side of the traveler ring with the peak of the V seized to another rope (all of these are .018). To have the V centered I attached the two ends to the traveller then seized a loop at the resulting center. The result is the in-haul with its two seized lines laying along top of the bowsprit and belayed to the port bitt post. I left the loop both seizings a little large to give a better look of the joined lines, no reason to squeeze them tight.

Then the tricky and fun part is pulling the right tension on all three, back and forth and together. to arrange the traveler ring into a fixed position on the bowsprit. Per the plans I chose this to be 80mm from the far end of the bowsprit, which kinda looks right.

post 54-4377.jpg

post 54-4375.jpg

post 54-4386.jpg

And this is how it all looks like this in the end. And now it’s time for the ratlines.  Unless there is something else I can do first….

Thanks for stopping by. The likes and especially the comments are always appreciated.

Regards,

Glenn

In progress: HMS Surprise

Completed: HMS Winchelsea , HM Cheerful (repost), HM Flirt, HM Harpy, Medway Longboat, HMS Pegasus, HM Granada, AVS, Royal Barge, HMS Vanguard, HM Pickle, Fair American, Lady Nelson, Bluenose

  • Author

Post 55

Ratlines

Ran out of other things to do, time to begin. The only good thing about fracturing my frame way back in the beginning and having to buy a second starter kit is that it came with a second set of plans that I could cut up, which I’ve frequently done. 

post 55-4411.jpg

I scanned a copy of the plans, printing a copy for starboard, reversing the scanned image using Apple Preview and printing that for the port side. I mounted the paper on stiff card with the bottom the right height to match the paper sheer pole to the actual one on the model,  then marked both in 5 and 10 line increments. This saved me the step of making my own grid, more importantly gave me good vertical lines to keep the shape right. The spacings are correct, the angles of the photos or the paper leaning back throws off the perspective.

post 55-4420.jpg

I used .012 dark brown line did them in sections, first the “five lines” which I’d highlighted in orange, then the “ten lines” in green ,then the three’s, ones, fours and twos successfully avoiding the hour glass problem. I glued each after I was done with a section, allowed them to dry and cut off the tails before doing the next section keeping the working field clean and lines from shifting.

I did all the lines using clove hitches working left to right (because I’m left handed). Once I got going I was whipping across the shrouds, the clove hitch allows adjusting for the right tension easily and frankly just looks good. Next time maybe I’ll do half hitches on the outside, maybe not.

post 55-4427.jpg

Another benefit of doing them in random spaced groups is I didn’t focus on ‘aargh…how many more rows until I get to the top….’ By doing sections I didn’t think about anything but that section and was almost surprised when there weren’t anymore to do. So I immediately hung 4 lines from my top cabinet down to the worktop and weaved more ratlines….or maybe not.

For all my delaying actually completing the ratlines wasn’t really that big a deal. It basically took me a days work for each side and was kind of relaxing in a weird way. The long dreaded task is done, turns out not that much dread.

Regards,

Glenn

In progress: HMS Surprise

Completed: HMS Winchelsea , HM Cheerful (repost), HM Flirt, HM Harpy, Medway Longboat, HMS Pegasus, HM Granada, AVS, Royal Barge, HMS Vanguard, HM Pickle, Fair American, Lady Nelson, Bluenose

  • Author

Post 56

Remaining Standing Rigging & Rope Coils

It’s been a while since my last post, lots of stuff going on outside the shipyard.

Rope Coils

It is time to start doing final tension on lines and adding rope coils. I’ve again chosen to do them differently than on past models, I think the 1:48 scale makes me think differently. I went searching on MSW for ideas and found multiple posts on Flemish coils (which I’m not a fan of doing) however there wasn’t much on “working coils” or at least a way I wanted to do them. I did locate a repost by @ccoyle of a method used by ‘Peter-V’ that served as a starting point, so credit and thanks to him and to Chris for further sharing it.  I once again put my spin on it and wasted a bit of rope sorting out a look I like. I also didn’t determine a key step until Googling rope coils and finding a series of images related to actual sailing. Side note for Cheerful builders, I went through a lot of .018 Light Brown rope, in fact I wouldn’t have had enough to finish the boat if I hadn’t ordered some for my next build of Flirt. I had to cut into that stock, a problem for another day. I thought I was fairly judicious but maybe these rope coils used too much. One coil is a lot of rope and I have made and remade them. I probably should have been more efficient with the lengths of tackle. I’m sure it’s my fault, just a heads up.

post 56-4452.jpg

I want the coils to look natural and each one be consistent but at the same time different from the one next to it - like the lines are in use, certainly not inspection ready. Each one is made, then painted in very watered down white glue, then with a wet brush to avoid white glue marks. Once dry then smushed (that’s a technical term) with my finger and bent around to shape it to its location - again being different each time.

post 56-4362.jpg

After a few false starts I came up with this ‘rope board’ using brass tubing, brass rod, and brass belaying pins. All the brass is removable, which is essential to how I make them. There are two set up for pin rails and two for cleats and another just for straight up coils, the differences being the size of the eye and length of the coils (the board shows it took a few iterations to get there).

post 56-4338.jpg

I should do a separate post in the rigging forum to provide more detail from what I’ve learned, even more since I took these photos. The short(er) version is to wrap the rope around the brass pins leaving the top extra long (it goes on for a few inches behind the board) before seating it in a split on the top, after 4-6 wraps (I varied them) the end of the rope seated in another split in the bottom. Loosen the top excess rope and grap the first (bottom) loop with tweezers (it’s tricky, sharp pointed tweezers are essential)and pull it out.

post 56-4348.jpg

post 56-4349.jpg

Loop it top over bottom then complete 360 degree (not 180, that’s the key step I’d missed from the research) clockwise loop and place that over the belaying pin at the top. It represents the pin rail on the boat (or the top of a cleat). Snug that up with the top rope.

post 56-4355.jpg

post 56-4357.jpg

Remove the top brass rod and tighten it further, another lesson as I wasted rope, not too tight as it is in this photo - shape the loop a little. Then paint it all with watered down white glue. Remove the bottom brass rod after the glue dries and lift it off the board. Important point, I used a drop of CA on the back side of the coil’s top to seal the top rope that formed the loop (another lesson learned) ‘before’ sniping of the excess of both the bottom and top ropes otherwise the whole thing may collapse into a wad (he said having done that). I then did the artistic smushing and bending before installing it on the ship.

I hope that makes some sense, each one I make I do a little different but this is the essence of what I learned from others then modified to work for me. A final point, getting the watered down glue the right amount of watered down is another key - not so stiff not to loose. I’m still working to finding the magic formula.

Topmast Shrouds

post 56-4440.jpg

These can’t be done until the ratlines are complete as at the end they thread through the ratlines (for me the second and third) following a straight-line from the  topmast to their belaying points on the channels. Done with .35 dark brown rope looped seized in a loop at the topmast they end in ¼ blocks after being glued to the slots at the ends of the cross trees. Important to get the line snug without being tight, the topmast is a relative toothpick and easy to bend. .012 light brown tackle finishes it off with another ¼ block seized to a hook and to eyebolts in the channels. Seems easy enough and it should be but I must say I had a lot of “fiddling” to do to get them even, the right height, and the tackle seized back onto itself (like the main shrouds) while working between the ratlines. Patience and perseverance in abundance is called for, the first which I’m always wishing I had more.

Topmast Stay

post 56-4454.jpg

It’s a bit difficult getting a good photo of this long run of .018 brown rope. I didn’t have the light right for and my temporary off-white backdrop has fold marks. I just hang a piece of cloth behind and tacked over the window for quick and easy progress photos, not how I formally shoot white background photos on rolled white paper.  I’ll do better for finished photos (though at the moment my stands have been turned into an inside tent for my granddaughter, a far better use for them).

post 56-4458.jpg

Anyway, the stay is seized at the bowsprit, I elected to match the main stay by leaving the seizing long then securing the extra length with two clove hitches. I thought it gave it a more finished look.

post 56-4453.jpg

The stay runs from there through a 3/16 block at the topmast and dangles about 140mm (really to where I thought it looks good) from the deck. A 3/16 block is seized with .018 tackle which runs through another 3/16 block seized to a hook (I’m getting pretty good at knocking hooks out from 24 gauge wire) into an eyebolt at the base of the mast then back through the upper block and finished off at a cleat on the mast. Another side note, I think the plans call for 6 cleats on the mast. I wasn’t sure at the the time but I put 8 cleats (little late to note that I guess). They are all going to come in handy, and in my opinion look better.

The plans do a great job of showing what rope and blocks to use in a table, how the run should look and includes an easy to follow deck belay map. I like sorting it all out from plans to model. If I haven’t mentioned the 3 sheets of plans are very well done and an excellent roadmap throughout the build.

Topmast Backstays

post 56-4449.jpg

post 56-4456.jpg

Chuck notes in the monograph while these are included in the plans in actuality rarely used and so are optional to install.  I chose to include them because they provide a little balance to the stern and because I didn’t want the third outside metal strap left empty. Besides who doesn’t want to run more string about the boat. They consist of a long length of .018 brown line looped and seized at the topmast with ¼ blocks about 130mm above the deck where .018 light brown tackle is carried down to another ¼ block & hook connected to the third metal strap on the outside of the hull, back up to the block then finished at a cleat inside the bulwark. All of this is shown nicely on the plans. I have not tensioned and glued either these or the main backstays. I have to move them out of the way to access the pin rails and mast cleats for the remainder of the rigging. For a similar reason I haven’t glued in the tiller yet, I need the working room for my hands. Once I’m finished the rigging for the yards I’ll come back to the tiller and gluing in these stays.

Standing Rigging

post 56-4457.jpg

With that I have completed all of Cheerful’s standing rigging and 13 of the 14 chapter monograph. I now turn to the making the yards (back to the lathe and mill) and the remainder of the running rigging. My journey is almost complete.

Thanks for stopping by, as always I appreciate your likes and especially your comments. I hope you’re still finding the log enjoyable to follow.

Regards,

Glenn

In progress: HMS Surprise

Completed: HMS Winchelsea , HM Cheerful (repost), HM Flirt, HM Harpy, Medway Longboat, HMS Pegasus, HM Granada, AVS, Royal Barge, HMS Vanguard, HM Pickle, Fair American, Lady Nelson, Bluenose

Your rigging work is outstanding. I am also very impressed with your rope coils. Thank for sharing your technique.

RossR

Completed: HMS Beagle, Frigate Diana and Santisima Trinidad Cross Section by Occre and NRG Half Hull

Current: USF Essex - Model Shipways and Colonial Schooner Sultana - Scratch Build

Your rope board is a great idea. I'm stealing that one I think. I like how you vary the size of the coils. Add some sails and your Cheerful would be all a taunto!

Cheers,

Todd

I am always doing what I cannot do yet, in order to learn how to do it.

Vincent Van Gogh

Glenn, when you served your rope did you apply a watered down white glue mix afterwards as Chuck suggests in his Serv-o-Matic instructions? Did you have any problems with the serving unwrapping from the rope? I'm about to start serving rope this week and want to know if I should be concerned about that.

Thanks,

Erik

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

Recently Browsing 0

  • No registered users viewing this page.

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.