Post 8
9547
The temporary bulkhead cross beams have been installed and the hull structure is now more secure for fairing. The 'broken' ears required additional clamping to secure.
I must now return to the stern area and fix the last two modified bulkheads and the much less robust stern timbers.
This is going to be a testy part of the exercise, gone is the reassuring fit of solid laser cut parts slotting seamlessly into place.
I will now find out whether my modification passes muster, or is classified as fubar as our American cousins may say.
9556
9557
I used a cardboard template of the Quarterdeck to gauge how the run of the deck looks before I commit to gluing Bulkheads 12 and 13 into place.
9500
Bulkhead 12 is first glued ensuring it sits square and vertical, the template is used to check the square.
Bulkhead 13 follows using the same procedure.
9578
When it comes to the Stern frames the central two are glued first, followed by the middle and outer frames.
9579
Spacers/carlings are inserted to brace against any lateral movement.
I used the stern pattern to check that the lights sit properly between the frames, but the real test will be when the broadside patterns are matched up with the stern and counter patterns.
9584
9587
All now fixed into place.
9575
I have decided to fit a Skylight over the Great Cabin which will involve fitting Carlings. There is no indication of one on the single Hillhouse plan, but the Royal Yacht Caroline has one and I’m sure our feisty Duchess would accept no less.
Besides it will offer a view of the Great Cabin.
I also halved the ply Quarterdeck sub pattern for ease of fitment.
B.E.
24/09/2026
By
Blue Ensign ·